Operating Manual
S125E
27
You will find the HOT ZONE (H) on the
blasted surface where the machine has
developed the highest blast intensity.
This ZONE is normally a little lighter and
warmer than the rest of the blast cleaned
area due to the heat that is generated by
the impacts of abrasive.
• If the blast pattern is exactly in the
middle of the HOT ZONE, you may
proceed with normal blasting.
• If the blast pattern shows irregularities
in the HOT ZONE, you must readjust
the control cage slightly until the
pattern is exactly in the middle. (See
the following for proper adjustments.)
Note: All descriptions are described from the front into the blast wheel.
• If the blast result shows strong blasting on the right-hand side (R) and weak blasting on the left-
hand side (shadows), turn the upper edge of the control cage clockwise (CW) for 2-4 mm.
• If the blast result shows strong blasting on the left-hand side (L) and weak blasting on the right-
hand side (shadows), turn the upper edge of the control cage counter-clockwise (CCW) for 2-4
mm.
Never slacken cage clamps or try to adjust the control cage when the machine is in
operation.
7.7
Recommended Spare Parts List
To avoid long standstills of the machine, IMPACTS recommends to keep the following spare parts in
stock.
Number
Description
Amount
1
Impeller
1
2
Control Cage
1
3
Blast Wheel
1
After the change of any spare parts,
you should always adjust the blast
pattern. Only this will guarantee your
machine will work most efficiently and save
unnecessary wear and repair costs.
Summary of Contents for STREAMER S125E
Page 1: ...Operating Manual S125E Your Partner for Mobile Surface Preparation IMPACTSamericas com...
Page 35: ...Operating Manual S125E 33 10 2 Wheel Drive...
Page 36: ...S125E Operating Manual 34 10 3 Housing Assembly...
Page 37: ...Operating Manual S125E 35 10 4 Valve Actuator Assembly...
Page 38: ...S125E Operating Manual 36 10 5 Base Seal Assembly...
Page 39: ......