INDEX
USER
page
INSTALLER
page
MAINTENANCE TECHNICIAN
page
1 Boiler installation ................................................5
1.1 Installation recommendations. .........................5
1.2 Main dimensions. ...............................................6
1.3 Anti-freeze protection. .......................................6
1.4 Gas connection. ...................................................7
1.5 Hydraulic connection. ........................................7
1.6 Electrical connection. .........................................7
1.7 Remote controls and room chrono-thermostats
(Optional). ...........................................................8
1.8 External temperature probe (Optional). ..........8
1.9 Immergas flue systems. ......................................9
1.10 Tables of Resistance Factors and Equivalent
Lengths. ................................................................9
1.11 Outdoor installation in partially protected area. ...11
1.12 Horizontal concentric kit installation. ...........12
1.13 Vertical concentric kit installation. ................13
1.14 Separator kit installation. .................................14
1.15 Adapter kit installation C9. ............................15
1.16 Ducting of flues or technical slots. .................16
1.17 Configuration type B open chamber and forced
draught for inside. .............................................16
1.18 Flue exhaust to flue/chimney. ..........................16
1.19 Flues, chimneys, chimney caps and terminals. ......17
1.20 System filling. ....................................................17
1.21 Filling the condensate trap. .............................17
1.22 Gas system start-up. .........................................17
1.23 Boiler start up (ignition). .................................17
1.24 Circulation pump. .............................................18
1.25 Kits available on request. .................................19
1.26 Boiler components. ...........................................19
2 Instructions for use and Maintenance. ..........20
2.1 Cleaning and maintenance. .............................20
2.2 General warnings. .............................................20
2.3 Control panel. ....................................................20
2.4 Description of functioning states. ..................21
2.5 Using the boiler. ................................................22
2.6 Troubleshooting. ...............................................23
2.7 Boiler shutdown. ...............................................25
2.8 Restore heating system pressure. ....................25
2.9 Draining the system..........................................25
2.10 Anti-freeze protection. ....................................25
2.11 Case cleaning. ....................................................25
2.12 Decommissioning. ............................................25
2.13 Parameters and information menu. ...............26
3 Boiler commissioning (initial check) .............28
3.1 Hydraulic Diagram. ..........................................28
3.2 Wiring diagram. ................................................29
3.3 Troubleshooting. ...............................................29
3.4 Converting the boiler to other types of gas. ..30
3.5 Calibration of number of fan revs. .................30
3.6 Adjustment of the air-gas ratio. ......................31
3.7 Checks following conversion to another type of gas. 31
3.8 Programming the P.C.B....................................32
3.9 "Chimney sweep function" (F2). .....................34
3.10 Pump anti-block function. ..............................34
3.11 three-way anti-block function.........................34
3.12 Radiators anti-freeze function. .......................34
3.13 P.C.B. periodical self-check. ............................34
3.14 Automatic vent function. .................................34
3.15 Solar panels coupling function. ......................34
3.16 Yearly control and maintenance of the
appliance. ...........................................................34
3.17 Casing removal. .................................................35
3.18 Variable heat power. .........................................36
3.19 Combustion parameters. .................................36
3.20 Technical data. ...................................................37
3.21 Key for Data nameplate. ...................................38
3.22 Technical parameters for mixed boilers (in
compliance with Regulation 813/2013). ........39
3.23 Product data sheet (in compliance with
Regulation 811/2013). ......................................39
3.24 Parameters for filling in the assembly sheet. .40
STD.002229/002
Summary of Contents for VICTRIX ZEUS SUPERIOR 32 2 ERP
Page 1: ...VICTRIX SUPERIOR 32 2 ERP Instruction and warning book IE 1 037985ENG STD 002229 002 ...
Page 2: ...STD 002229 002 ...
Page 44: ...44 STD 002229 002 ...
Page 45: ...45 STD 002229 002 ...
Page 46: ...46 STD 002229 002 ...
Page 47: ...47 STD 002229 002 ...