17
INS
TALLER
US
ER
MAINTEN
AN
CE TECHNI
CI
AN
1.19 FLUES, CHIMNEYS, CHIMNEY CAPS
AND TERMINALS.
The flues, chimneys and chimney caps for the
evacuation of combustion products must be in
compliance with standards in force. The chimney
caps and the roof exhaust terminals must respect
the outlet quotas and the distance of the foreseen
technical volumes from the current technical
regulations.
Positioning the wall exhaust terminals.
The
exhaust terminals must:
- be installed on external perimeter walls of the
building;
- be positioned according to the minimum
distances specified in current technical
standards.
Combustion products exhaust of natural or
fan assisted appliances in open-top closed
environments.
In spaces closed on all sides
with open tops (ventilation pits, air shafts,
courtyards etc.), direct flue exhaust is allowed
for conventional or fan assisted draught gas
appliances with a heating power range from 4 to
35 kW, provided the conditions as per the current
technical standards are respected.
1.20 SYSTEM FILLING.
Once the boiler is connected, proceed with
system filling via the filling valve (Fig. 1-28 and
2-8). Filling is performed at low speed to ensure
release of air bubbles in the water via the boiler
and heating system vents.
The boiler has a built-in automatic venting valve
on the circulator.
Check if the cap is loose.
Open the
radiator air vent valves.
Close radiator vent valves when only water
escapes from them.
Close the filling valve when the boiler manometer
indicates approx. 1.2 bar.
N.B.:
during these operations start/up the
circulation pump at intervals, acting on the main
switch positioned on the control panel.
Vent the
circulation pump by loosening the front cap and
keeping the motor running.
Re-tighten the cap
after the operation.
1.21 FILLING THE CONDENSATE TRAP.
On first lighting of the boiler combustion
products may come out the condensate drain;
after a few minutes’ operation check that this no
longer occurs. This means that the trap is filled
with condensate to the correct level preventing
the passage of combustion products.
1.22 GAS SYSTEM START-UP.
To start up the system, refer to the current
regulations.
In particular, for new gas systems:
- open windows and doors;
- avoid presence of sparks or naked flames;
- bleed all air from pipelines;
- ensure the internal system is properly sealed
according to the specifications set forth by
technical regulations in force.
1.23 BOILER START UP (IGNITION).
To commission the boiler (the operations listed
below must only be performed by a qualified firm
and without any unauthorised persons):
- ensure the internal system is properly sealed
according to the specifications set forth by
technical regulations in force;
- ensure that the type of gas used corresponds to
boiler settings;
- check that there are external factors that may
cause the formation of fuel pockets;
- switch the boiler on and ensure correct ignition;
- make sure that the gas flow rate and relevant
pressure values comply with those given in the
manual ( Par. 3.18);
- ensure that the safety device is engaged in the
event of gas supply failure and check activation
time;
- check activation of the main switch located
upstream from the boiler and in the boiler;
- check that the concentric intake-exhaust
terminal (if fitted) is not blocked.
The boiler must not be started up even if only
one of the checks should be negative.
STD.002229/002
Summary of Contents for VICTRIX ZEUS SUPERIOR 32 2 ERP
Page 1: ...VICTRIX SUPERIOR 32 2 ERP Instruction and warning book IE 1 037985ENG STD 002229 002 ...
Page 2: ...STD 002229 002 ...
Page 44: ...44 STD 002229 002 ...
Page 45: ...45 STD 002229 002 ...
Page 46: ...46 STD 002229 002 ...
Page 47: ...47 STD 002229 002 ...