background image

27

STVZ1I ed 10/09 

VICTRIX Zeus 1 I

Technical Documentation

Technical Documentation

Central heating request with Remote Control

The main selector switch (S2) in  "SUMMER and CAR" po-

sition enables the integrated P.C.B. and the Comando Amico 

Remoto remote control (CAR).

If the conditions detected by the Comando Amico Remoto 

remote control (CAR) require ignition in CH mode (CAR 

SUM/WIN selector switch in WINTER position, CH tempera-

ture adjustment higher than that detected by the central heating 

flow probe (B1), room temperature adjustment higher than that 

detected), the P.C.B. manages the ignition cycle, as described 

previously.

DHW request

If the temperature detected by the NTC probe positioned 

on the storage tank (B2) is lower than "Storage tank ON in-

tervention temperature" (set-point-3°K with jumper S9 closed, 

set-point-10°K with jumper S9 open), the boiler starts a DHW 

ignition cycle.

If the system pressure switch contact (S5) is closed (pressure 

detected in the primary circuit higher than minimum value),the 

integrated P.C.B. powers the pump (M1) and the motor (M) 

of the 3-way valve (M30). This functions until the end run 

switch "3" opens when the DHW position is reached.

Successively the integrated P.C.B. powers the fan (M20) and 

manages the speed.

With the consent of the safety thermostat (E4) and the flue 

safety thermostat (E6) and the fan (M20) reaching the "vali-

date ignition" speed, the integrated P.C.B. allows to start the 

ignition cycle by controlling, first the ignition electrodes (E1) 

and then both the coils of the gas valve (Y1).

The ignition of the burner is detected by the integrated P.C.B. 

by means of the ionisation electrode (E2).

When the flame has been detected, the fan speed is increased 

in a way to immediately reach (if requested) the maximum 

adjusted value.

Successively, the flame modulation guarantees maintenance 

of the flow temperature ideal for the correct attainment of 

the set.

When the temperature measured by the DHW probe (B2) 

exceeds the value requested (temperature  set),  the  burner  is 

switched off.

Every time the burner switches off the fan functions at mi-

nimum speed for 55 seconds and the pump performs post-

circulation for 60 seconds.

If, during functioning, the flow probe (B1) measures a tem-

perature  higher  than  90  °C,  the  burner  is  switched  off.  A 

new ignition cycle can start only if the temperature drops to 

75°C.

Central heating anti-freeze request

When the temperature detected by the CH flow probe (B1) 

falls below 4 °C, the board gives consent for ignition and keeps 

the generator working with the burner at minimum output 

until a boiler temperature equal to 30 °C is reached (radiators 

anti-freeze).

N.B.:

 The function is active with the main selector switch (S2) 

in

(summer) or 

(winter) position.

DHW anti-freeze request

When the temperature detected by the DHW probe (B2) falls 

below 4 °C, the board gives consent for ignition of the boiler 

and keeps the generator working with the burner at minimum 

output until a temperature of 10 °C is reached.

During functioning, the water in the primary circuit remains 

below 42 °C as on reaching this temperature the board switches 

the burner off.

N.B.:

 The function is active with the main selector switch (S2) 

in 

(summer) o 

(winter) position.

At  the  end  of  any  anti-freeze  request,  a  post-circulation  is 

performed for the duration of 55 seconds.

"Chimney sweep" request

With  the  boiler  in 

  (Stand-by)  position,  turn  the  main 

selector (S2) into the Reset position for at least 8 seconds (the 
"chimney sweep" 

 symbol will appear on the display), On its 

release, the board gives the consent for ignition of the generator 

and keeps it functioning for 15 minutes.

The output is determined from the position of the CH regu-

lation selector (notch N°9 corresponds to the maximum output, 

notch N°0 corresponds to the minimum output).

The  function  is  signalled  by  the  flashing  "chimney  swe-

ep"  symbol  and  the  code  “E07”  on  the  CAR  display  (if 

mounted).

Only  the  limit  thermostat  function  performed  by  the  CH 

sensor (B1) is respected in this mode (90°C for CH tempe-

rature range 25°C - 85°C or 50°C for CH temperature range 

25°C - 50°C).

The "chimney sweep" function is only introduced if there are 

no DHW or anti-freeze requests in progress.

It can be cut-off by removing the power supply to the circuit, 

taking the main selector switch to the   (Stand-by) position 

or after 15 minutes.
N.B.:

 If the main selector switch is held (S2) in the Reset po-

sition for a time exceeding 15 seconds, the "chimney sweep" 

function is exited and the calibration function is activated 

(see  heat  output  adjustment).  If  the  main  selector  switch  is 

turned (S2) for more than 30 seconds, the boiler will go to 

the Stand-by status and the error code E08 will be displayed, 

equivalent to "Reset selector switch fault". To restore appliance 

functioning the main selector switch must be turned (S2) to 

the   position (Stand-by).

Summary of Contents for VICTRIX Zeus 26 1 I

Page 1: ...VICTRIX Zeus 26 1 I Condensation type wall hung room sealed fan assisted boiler with stainless steel storage tank VICTRIX Zeus 26 1 I...

Page 2: ......

Page 3: ...he regulation and control are entrusted to a P C B with inte grated microprocessor with continuous flame modulation via 2 sensors DHW and CH which through a backlit display shows the functioning state...

Page 4: ...al connection G Gas supply SC Condensate drain minimum internal diameter 13 mm R System return M System flow RC Domestic hot water pump optional AC Domestic hot water outlet AF Domestic hot water inle...

Page 5: ...cal Documentation VICTRIX Zeus 1I control panel Key 1 Boiler status signal display 2 Stand by Domestic water Remote Control Domestic water and Heating Reset Selector 3 Domestic hot water temperature s...

Page 6: ...2 Detection electrode 13 Condensation module 14 Flue safety thermostat 15 Air intake pipe 16 Sample points air A flue gas F 17 Negative signal pressure point 18 Burner 19 Positive signal pressure poin...

Page 7: ...pe 13 Condensation module 14 Manual air vent valve 15 Flue hood 16 Air sample point 17 p gas pressure point 18 Flue sample point 19 Delivery probe 20 Safety thermostat 21 Burner 22 Ignition electrodes...

Page 8: ...ition of the motorised 3 way valve A Head available to the plant at third speed with by pass excluded B Head available to the plant at third speed with by pass inserted C Head available to the plant a...

Page 9: ...while the fourth is arranged in the condensation chamber which is separated from the combustion chamber by sheet steel see flue circuit PTo reduce head losses to a minimum and increase the flow rate a...

Page 10: ...ion thanks to a motor 1 that causes movement according to necessity Operation When it is necessary to reach the CH or DHW position the motor 1 is activated by the P C B Functioning of the motor leads...

Page 11: ...the flow manifold unit 1 and is coupled to a micro switch that prevents functioning of the burner when the pressure detected is below 0 3 bar Prevents overheating of the main heat exchanger Automatic...

Page 12: ...Replacement of the automatic air vent valve To replace the air vent valve the relative locking clip must be removed and the valve extracted 9 paying attention not to damage the relative O ring N B wh...

Page 13: ...at loss Operation Following a DHW request the P C B starts the boiler pump 7 and powers the electric 3 way valve motor 8 The consequent shifting of the valve into the DHW position see electric 3 way v...

Page 14: ...tional Allows to connect the pipes of any DHW pump system It consists in a pipe that is inserted in the boiler after the anode and relative cap have been removed With the installation of the kit the a...

Page 15: ...ent air The mixture obtained in this way is ignited on the surface of the cylindrical burner 8 by the discharge of the ignition electrodes 9 Gas valve The gas valve is equipped with two main coils con...

Page 16: ...to mix it with the air The nozzle 2 has a different diameter depending on whether natural gas or LPG is used as working with both gases with more or less constant pressure its section establishes the...

Page 17: ...w otherwise no discharge is obtained Detection electrode 9 It is controlled by the integrated P C B and detected burner ignition It also acts as a flue safety device when any air intake problems or pr...

Page 18: ...the system flow and return pipes and of the condensate discharge pipe positioned in the lower part of the module Loosen the two screws 7 and 9 that fix the condensation module to the support back usin...

Page 19: ...urner enter the calibration function by positioning the DHW regu lation selector switch on notch N 6 and the CH regulation selector switch on notch N 9 turn the main selector switch to the Reset posit...

Page 20: ...ation max DHW min DHW CH and max CH always turn the main selector switch to the Reset position for at least 2 seconds The boiler will go into chimney sweep mode and at this point it is possible to ver...

Page 21: ...present on the control panel to minimum and check the correspondence of the carbon dioxide CO2 value measured with that indicated in the table for the minimum output see table at the side if the value...

Page 22: ...he sealed combustion chamber 6 which has a sheet steel section on its base 7 that divides it from the condensation chamber 2 and diverts the flow of flue gases to the outside of the module In this way...

Page 23: ...ler The GREEN SERIES flue kit is made in plastic PPS self extinguishing polypropylene suitable for resisting the corrosive action of the acid condensate Configuration with sealed chamber and fan as si...

Page 24: ...or 80 flexible For that regarding the head losses relative to each accessory for the various combinations that can be performed see the instructions relative to the intake and exhaust terminals see b...

Page 25: ...chimneys technical slots to be used exclusively with a unique Immergas condensing appliance Fit a 90 bend 5 to the appliance exhaust pipe which using the necessary vertical extensions 2 must be conne...

Page 26: ...the boiler flue evacuation pipe Using a divided kit 80 80 1 bend 1 m in intake and exhaust with intake grid the maximum length allowed is 30 straight vertical metres System for ducting 80 flexible It...

Page 27: ...at E6 Flue safety thermostat F1 Phase fuse F2 Transformer fuse G2 Igniter M1 Boiler pump M20 Fan M30 Three way valve S2 Selector switch functioning S5 System pressure switch S7 Central heating timer s...

Page 28: ...he speed With the consent of the safety thermostat E4 and the flue safety thermostat E6 and the fan M20 reaching the vali date ignition speed the integrated P C B allows to start the ignition cycle by...

Page 29: ...only if the temperature drops to 75 C Central heating anti freeze request When the temperature detected by the CH flow probe B1 falls below 4 C the board gives consent for ignition and keeps the gener...

Page 30: ...etection electrode E2 Inputs The board power supply is connected to the L and N clamps of the X1 connector 230 V AC 10 15 50 Hz 5 230 V 50 Hz Detects the ignition of the burner by which the flame is h...

Page 31: ...probe B4 optional PTC probe 1 k 25 C When the pressure of the boiler circuit is below 0 3 bar it determines burner switch off System pressure switch S5 Open No pressure Closed Pressure OK It enables...

Page 32: ...X40 jumper must be eli minated Comando Amico Remoto remote control CAR optional See Comando Amico Remoto remote control functioning CAR Allows the control of 1 additional zone valve by means of CAR wh...

Page 33: ...et position in order to restore fun ctioning of the appliance N B It is possible to reset the anomaly up to 5 consecutive times after which the function is prevented for at least one hour and one atte...

Page 34: ...elative anomaly and prevents functioning in DHW mode but functioning in CH mode is allowed Breakage of the NTC DHW probe B2 The breakage of the central heating flow probe B1 is signalled by the relati...

Page 35: ...mbol Numerical characters to indicate temperatu re any error code or optional external probe temperature correlation factor Degrees symbol External probe connection symbol Connection to Comando Amico...

Page 36: ...NTC flow probe anomaly 05 E05 Reset selector switch fault 08 E08 Calibration function active displayed only on CAR E09 No circulation 10 E10 Storage tank probe anomaly 12 E12 Configuration error 15 E1...

Page 37: ...2580 Efficiency 80 60 Nom Min 96 9 93 2 Efficiency 50 30 Nom Min 105 3 106 8 Efficiency 40 30 Nom Min 107 5 108 8 Heat loss at casing with burner On Off 80 60 C 0 58 0 90 Heat loss at flue with burne...

Page 38: ...16 0 13760 1 75 2 32 23 7 1 30 2 33 23 7 1 28 3 09 31 5 15 0 12900 1 64 2 07 21 1 1 22 2 07 21 1 1 20 2 75 28 1 14 0 12040 1 53 1 83 18 7 1 14 1 83 18 6 1 13 2 44 24 9 13 0 11180 1 43 1 61 16 4 1 06...

Page 39: ...rmostat cod 3 014438 Radio timer thermostat wireless cod 3 014439 Zones control unit kit cod 3 011668 Relay interface kit for zone valve coupling cod 3 017331 GSM telephone control kit cod 3 017182 DH...

Page 40: ...e boiler to start a new ignition cycle Ignition cycle CENTRAL HEATING MODE Main selector switch in winter position Turn the heating selector to a maximum and interrupt and DHW re quests The pump start...

Page 41: ...ains the set tem perature No Check the maximum DHW heating ou tput and adjust it to maximum See section D Yes The domestic hot water request is satisfied Yes The burner stays on after the first 10 sec...

Page 42: ...the valve make sure that there is enough gas inlet dynamic pressure and that the gas valve is correctly calibrated 01 c The electrode detects a direct current of 6 8 A during the burner ignition phase...

Page 43: ...ream from the boiler Error 02 intervenes also if the board detects a loss of the flame signal 6 times in 8 5 minutes ERROR 05 NTC flow probe anomaly The wiring between the flow probe and the board con...

Page 44: ...OK Check continuity of the cable on clamp 4 of connector X12 No Restore the electric connection replace the wiring Yes Replace the fan If the anomaly persists replace the P C B ERROR 20 Parasite flam...

Page 45: ...ly connection wires and relative external fuses are integral No Restore the electric connection replace the cables external fuses Yes Replace the P C B ERROR 38 Loss of flame signal It is displayed ev...

Page 46: ...ING MODE 230 VDC are present to the clamps 1 3 of connector X5 on the P C B DOMESTIC HOT WATER MODE 230 VDC are present to the clamps 1 2 of connector X5 on the P C B No Replace the P C B Yes The wiri...