background image

15

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

3.4  CONVERTING THE BOILER TO 

OTHER TYPES OF GAS.

If the boiler has to be converted to a different gas 

type to that specified on the data plate, request 

the relative conversion kit for quick and easy 

conversion.

The gas conversion operation must be carried 

out by an authorised company (e.g. Immergas 

After-Sales Technical Assistance Service).

To convert to another type of gas the following 

operations are required:

- disconnect the appliance;
-  replace the main burner injectors, making sure 

to insert the special seal rings supplied in the 

kit, between the gas manifold and the injectors;

- re-power the appliance;
- select, using the boiler key, the gas parameter 

type (P1) and select (

nG

) in the case of methane 

supply or (

LG

) in the case of LPG supply;

- adjust the boiler nominal heat output;
- adjust the boiler nominal heat output in 

domestic hot water phase;

-  adjust the boiler nominal heat output in heating 

phase;

- adjust (eventually) the maximum heating 

power;

- seal the gas flow rate regulation devices (if 

settings are modified);

- after completing the conversion, apply the 

sticker, contained in the conversion kit, near 

the data-plate. Using an indelible marker pen, 

cancel the data relative to the old type of gas.

These adjustments must be made with reference 

to the type of gas used, following that given in 

the table (Par. 3.16).

3.5  CHECKS FOLLOWING 

CONVERSION TO ANOTHER TYPE 

OF GAS.

After making sure that conversion was carried 

out with a nozzle of suitable diameter for the 

type of gas used and the settings are made at the 

correct pressure, check that:

- there is no flame in the combustion chamber;
-  the burner flame is not too high or low and that 

it is stable (does not detach from burner);

- the pressure testers used for calibration are 

perfectly closed and there are no leaks from 

the gas circuit.

N.B.:

 all boiler adjustment operations must 

be carried out by an authorised company (e.g. 

Immergas After-Sales Assistance). Burner 

adjustment must be carried out using a 

differential "U" or digital type pressure gauge 

connected to the gas valve outlet pressure point 

(part. 4 Fig. 3-3), keeping to the pressure value 

given in the table (Par. 3.16) according to the type 

of gas for which the boiler is prepared.

3.6  POSSIBLE ADJUSTMENTS.

• Adjustment of boiler nominal thermal heat 

output.

-  Press the domestic hot water adjustment button 

(+) (3 Fig. 2-1) up to the maximum operating 

temperature.

- Open the domestic hot water cock in order to 

prevent modulation intervention.

-  With the brass nut (3 Fig. 3-3) adjust the boiler 

nominal output, observing the maximum 

pressure values stated in the tables (Par. 3.16) 

depending on the type of gas.

-  By turning in a clockwise direction the heating 

potential increases and in an anti-clockwise 

direction it decreases.

• Adjust the boiler minimum heat output in the 

domestic hot water phase (Fig. 3-3).

 

N.B.:

 only proceed after having calibrated the 

nominal pressure.

  Adjustment of the minimum thermal input 

is obtained by operating on the cross plastic 

screws (2) on the gas valve maintaining the 

brass nut blocked (3);

-  disconnect the power supply to the modulating 

coil (just disconnect a faston); by turning 

the screw clockwise, the pressure increases, 

anti-clockwise it decreases. On completion of 

calibration, re-apply the power supply to the 

modulating coil. The pressure to which the 

boiler minimum power must be adjusted, must 

not be lower than that stated in the tables (Par. 

3.16) depending on the type of gas.

N.B.: 

to adjust the gas valve, remove the plastic 

cap (6); after adjusting, refit the cap.

3.7  PROGRAMMING THE P.C.B.

The boiler is prepared for possible programming of 

several operation parameters. By modifying these 

parameters as described below, the boiler can be 

adapted according to specific needs.
To access the programming phase, proceed as 

follows (references Fig. 2-1):
- press buttons (1) and (2) for 15 about seconds 

until the programming mode is accessed on 

the display;

-  using buttons (3) and (4), select the parameter 

to be changed indicated in the following table:

List of  

param-

eters

Description

P1

Gas type selection

P2

Special gas G110 selection (Not 

used on this model)

P3

Fixed or correlated domestic 

hot water set-point

P5

Minimum CH output

P6

Maximum CH output

P7

Central heating ignitions timer

P8

Central heating ramp timer

P9

Boiler type (monothermal - 

bithermal)

- adjust the corresponding value consulting the 

table using keys (5) and (6);

- confirm the set value pressing the reset key 

(1) for approximately 5 seconds; pressing keys 

(3) + and (4) - at the same time to adjust the 

domestic hot water temperature, the operation 

is cancelled.

 

N.B.:

 after a period of time, without touching 

any keys, the operation cancels automatically.

Gas type selection.

 The setting of this function 

is used to adjust the boiler in order to function 

with LPG gas or Methane gas.

Gas type selection

Range of values which can 

be set

Parameter

LG 

(LPG) o

 nG

 (Methane)

P1

Gas G110 - Industrial gas (Not used on this 

model).

 The setting of this function is used to 

adjust the boiler in order to function with gases 

from the first family.

Gas G110 - Industrial gas (first family gas)

Range of values which can 

be set

Parameter

on

 - 

off 

(Standard setting)

P2

Fixed or correlated domestic hot water set-

point.

 By setting the parameter P3 in 

on

 mode, 

burner disabling is correlated to the adjustment 

of the domestic hot water temperature. In 

OFF

 

mode, the burner is switched off at maximum 

value.

Fixed or correlated domestic hot water 

set-point

Range of values which can 

be set

Parameter

on

 correlated - 

off 

fixed (Stand-

ard settings)

P3

Summary of Contents for NIKE MYTHOS 24 2 E

Page 1: ...NIKE MYTHOS 24 2 E IE Instruction and warning book 1 038789ENG ...

Page 2: ... technical information for installing Immergas boilers As for the other issues related to boiler installation e g safety in the work site environment protection injury prevention it is necessary to comply with the provisions specified in the regulations in force and principles of good practice In compliance with legislation in force the systems must be designed by qualified professionals within th...

Page 3: ...ing 11 2 6 Restoring central heating system pressure 11 2 7 System draining 11 2 8 Anti freeze protection 12 2 9 Case cleaning 12 2 10 Decommissioning 12 3 Boiler commissioning initial check 13 3 1 Hydraulic diagram 13 3 2 Wiring diagram 14 3 3 Troubleshooting 14 3 4 Converting the boiler to other types of gas 15 3 5 Checks following conversion to another type of gas 15 3 6 Possible adjustments 15...

Page 4: ...of malfunctions faults or incorrect operation turn the appliance off immediately and contact an authorised company e g the Immergas Technical Assistance centre which has specifically trained staff and original spare parts Do not attempt to modify or repair the appliance alone Failure to comply with the above implies personal responsibility and invalidates the warranty Installation regulations thes...

Page 5: ... gas cock connection by following the mounting instructions illustrated in the figure The gas supply pipe must be suitably dimensioned according to current regulations in order to guarantee correct gas flow to the burnereveninconditionsofmaximumgenerator output and to guarantee appliance efficiency technical specifications The coupling system must conform to standards Fuel gas quality The applianc...

Page 6: ... 1 4 REMOTE CONTROLS AND ROOM CHRONO THERMOSTATS OPTIONAL The boiler is prepared for the application of room chrono thermostats or remote controls which are available as optional kits Fig 1 4 All Immergas chrono thermostats are connected with 2 wires only Carefully read the user and assembly instructions contained in the accessory kit On Offdigitalchrono thermostat Thechrono thermostat allows set ...

Page 7: ...responding to the top of the chimney flue independently of any caps must be out of the backflow area in order to prevent the formation of counter pressures that impede the free discharge of the combustion products into the atmosphere It is therefore necessary to use the minimum heights indicated in the figures stated in the regulation depending on the slope of the roof Direct exhaust outside The n...

Page 8: ...p on first speed To ensure optimal boiler operation in the case of new systems single pipe and module it is recommended to use the pump at maximum speed The circulation pump is already fitted with a capacitor Pump release If after a prolonged period of inactivity the circulation pump is blocked unscrew the front cap and turn the motor shaft using a screwdriver Take great care during this operation...

Page 9: ... 5 Gas valve 6 System filling valve 7 Flue safety thermostat 8 Primary heat exchanger 9 Delivery probe 10 Safety thermostat 11 Combustion chamber 12 Ignition and detection electrodes 13 System expansion vessel 14 Burner 15 Vent valve 16 By pass 17 DHW heat exchanger 18 Three way valve motorised 19 3 bar safety valve 20 System draining valve N B connection group optional ...

Page 10: ... or other devices Never clean the appliance or connected parts with easily flammable substances Never leave containers or flammable substances in the same environment as the appliance It is prohibited and dangerous to obstruct the air intake even partially for the ventilation of the room in which the boiler is installed Due to the danger functioning is also prohibited in the same room as suction d...

Page 11: ... hours code 03 it is necessary to reset the boiler manually by pressing the Reset button 1 If this anomaly persists contact a qualified technician for assistance e g Immergas After Sales Service Electro mechanical contacts This occurs when thesafetythermostat thefumepressureswitchor the system pressure switch do not work properly code 04 The boiler does not start try resetting the boiler If the an...

Page 12: ... a prolonged absence the system must be drained completely or antifreeze substances must be added to the heating system water In both cases the boiler domestic hot wa ter circuit must be drained In systems that are drained frequently filling must be carried out with suitably treated water to eliminate hardness that can cause lime scale 2 9 CASE CLEANING Use damp cloths and neutral detergent to cle...

Page 13: ...iance e g a draught gauge positioned at the exit of the appliance combustion products check that there is no backflow of combustion products into the room even during functioning of fans 3 1 HYDRAULIC DIAGRAM Fig 3 1 ensure activation of all adjustment devices seal the gas flow rate regulation devices if settings are modified check the production of domestic hot water check sealing efficiency of w...

Page 14: ...ermostat It can depend on the lack of water in the boiler little water circulation in the system or blocked pump Check on the manometer that the system pressure is within established limits Check that the radiator valves are not closed and also the functionality of the pump The boiler produces condensate This can be caused by obstructions of the chimney or flues with height or section not proporti...

Page 15: ...se direction the heating potential increases and in an anti clockwise direction it decreases Adjust the boiler minimum heat output in the domestic hot water phase Fig 3 3 N B only proceed after having calibrated the nominal pressure Adjustment of the minimum thermal input is obtained by operating on the cross plastic screws 2 on the gas valve maintaining the brass nut blocked 3 disconnect the powe...

Page 16: ... boiler 2 monothermal boiler with boiler P9 3 8 AUTOMATIC SLOW IGNITION FUNCTION WITH TIMED RAMP DELIVERY In the ignition phase the P C B carries out an increasing gas delivery ramp with pressure values that depend on the type of gas selected with preset duration This prevents every calibration or precision adjustment of the boiler ignition phase in any conditions of use 3 9 CHIMNEY SWEEP FUNCTION...

Page 17: ...ing can be completely removed as follows Fig 3 4 remove the frame 1 holding the edges and pulling it towards you as indicated by the arrows undo the 2 front screws 2 and the 2 lower screws 3 which fasten the casing 4 pull the casing 4 towards yourself and upwards at the same time in order to detach it from the upper hooks ...

Page 18: ... be inside the fairleads there must be no traces of blackening or burning N B when performing periodical maintenance of the appliance it is also good practice to check and perform maintenance on the heating system in compliance with that indicated by the regulations in force N B gas flow rates refer to heating power below a temperature of 15 C and pressure of 1013 mbar Burner pressure values refer...

Page 19: ...justable central heating temperature C 38 85 System expansion vessel total volume l 4 2 Expansion vessel factory set pressure bar 1 Water content in generator l 1 9 Head available with 1000 l h flow rate kPa m H2 O 24 5 2 5 Hot water production useful heat output kW kcal h 23 6 20296 Domestic hot water adjustable temperature C 30 38 60 77 Domestic hot water circuit flow limiter at 2 bar l min 7 7 ...

Page 20: ...ode Sr N Serial Number CHK Check Cod PIN PIN code Type Type of installation ref CEN TR 1749 Qnw min Minimum heating capacity domestic Qn min Minimum heating capacity heating Qnw max Maximum heating capacity domestic Qn max Maximum heating capacity heating Pn min Minimum heat output Pn max Maximum heat output PMS Maximum pressure system PMW Maximum pressure domestic D Specific flow rate TM Maximum ...

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ...immergas com Immergas S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617 Certified company ISO 9001 This instruction booklet is made of ecological paper Cod 1 038789ENG rev ST 002138 000 07 15 Inglese per IRLANDA IE ...

Reviews: