-14-
WHEN INSTALLATION HAS BEEN COMPLETED - CHECK :-
1
All pipe work and joints for leakage.
DO NOT USE COLOURED OIL ADDITIVES FOR LEAK DETECTION
2
All pipe work and fittings for insulation.
3
All bolts are secure and that the fan rotates freely.
MCU WIRING DIAGRAMS
1 Phase MCU 15 to 90
3 Phase MCU 30 to 100
3 Phase MCU 130 to 180
3 Phase MCU 200
Heronhill - for all your IMI requirements
Tel: 01823 665660
www.heronhill.co.uk
Fax: 01823 665807