9
IMER INTERNATIONAL S.p.A.
KOINE 3
14. MAINTENANCE
- Maintenance must be performed by adequately
trained personnel, after switching off the machine,
disconnecting it from the power supply and emptying the
hopper.
Check daily that the water filter is clean.
Check weekly that the compressor air filter is clean. If
deteriorated, replace.
Check weekly that the mixer is in good condition and replace if
necessary.
Check weekly that the motor connection is in good condition and
replace if necessary.
Check weekly that the electric motors are free of dust and dirt
and if necessary clean using compressed air.
Check weekly that the plug and socket contacts are clean, dry
and rust free.
Every six months arrange for an inspection of the machine by an
authorised IMER service centre.
- Spent oil is a special waste. Therefore it must be
disposed of according to current legislation.
- Always keep notices and symbols on the machine
legible
15. REPAIRS
- Never start up the plastering machine during
repairs.
Repairs to the electrical installation must be performed exclusively
by specialised personnel.
Use exclusively original IMER spare parts; modifications
to parts are strictly prohibited.
- If any guards are removed for repairs, ensure they
are refitted correctly at the end of work.
Summary of Contents for KOINE 3
Page 1: ...MORTAR MIXER Operating maintenance spare parts manual KOINE 3 1106007 1106008 1106009...
Page 8: ...7 IMER INTERNATIONAL S p A KOINE 3 11 13 12 14 1 5 4 6 10 2 3 8 7 9...
Page 18: ...17 IMER INTERNATIONAL S p A Z z y V y z K y U VV V V U Z V VK U z V y z VU U U Z U R LJ JK P J...
Page 25: ...24 IMER INTERNATIONAL S p A IEC WT M PPQ E E WT...