background image

IMER  INTERNATIONAL  S.p.A.

ET 300  (110 V/50 Hz)

-       -

7

GB

GB

Dear Client
Congratulations  on  choosing  the  IMER  winch,  the  reliable  and
innovative result of years of experience.

WORKING IN SAFETY
To work in complete safety, read the following instructions
carefully before installing the machine.

This OPERATION AND MAINTENANCE manual must be kept on site
by the person in charge, e.g. the site foreman, and must always be
available for consultation.
The manual is to be considered an integral part of the machine and
must  be  kept  for  future  reference  (EN  292/2)  until  the  machine  is
disposed  of.   If  it  is  damaged  or  lost,  a  replacement  copy  may  be
requested from the manufacturer.
The manual contains important information regarding site preparation,
installation,  operation,  maintenance,  and  ordering  spare  parts.
Nevertheless, the installer and the operator must both have adequate
experience and knowledge of the machine prior to use.
To guarantee the complete safety of the operator, safe operation and
long life of equipment, follow the instructions in this manual carefully,
and observe all safety standards currently in force for the prevention
of accidents at work (use of suitable footwear and clothing, hard hats,
safety harnesses, proper installation of railings around drops, etc.).

It is strictly forbidden to carry out any form of modification
to the steel structure, working parts of the machine or the
gantry structure.

IMER INTERNATIONAL declines all responsibility for non-compliance
with  laws  and  standards  governing  the  use  of  lifting  equipment,  in
particular; improper use, defective power supply, lack of maintenance,
unauthorised modifications, tampering with or damage to part or all of
the equipment, and partial or total failure to observe the instructions
contained in this manual.

IMER  INTERNATIONAL  reserves  the  right  to  modify  the
characteristics  of  the  hoist  and/or  the  contents  of  this
manual without any obligation to update previous machines
or manuals.

1. GENERAL DESCRIPTION

ATTENTION: Use of lifting equipment requires care and skill.
The  machine  must  be  operated  by  skilled  and  properly
instructed personnel only.
1)  The  machine  is  designed  to  lift  materials  only and  for
use in building construction sites.
2) Carrying persons and/or animals is prohibited.
3) The machine must not be used in potentially explosive
atmospheres or underground.

The machine consists of (fig. 1):
- frame (ref. 6) with hand brake (ref. 8).
- Drum (ref. 3) fitted to reduction gearbox shaft (ref. 11), steel rope
(ref. 1) lift hook (ref. 2) and counterweight (ref. 10);
-  Gearmotor  consisting  of  an  electric  brake  motor  (ref.  4)  and  oil
reduction gearbox (ref. 11).
- Up position control lever (ref. 9).
- Electrical system (ref. 5), pendant control with three pushbuttons
(ref. 12) and flying socket (ref. 13).

2. IMER HOIST SUPPORT STRUCTURE

The structure supporting the winch must withstand  the loads generated
during operation (Fig. 2).
IMER  supplies  a  gantry  support,  as
shown in fig. 7, for use on building sites
and specially designed to transfer loads
to the load support structure.

ATTENTION
The 

EC 

Declaration 

of

Conformity enclosed with the
present manual is only valid if
only  IMER  components  are
used for the winch and gantry.

If  this  condition  is  not  complied  with,  the  Declaration  is
applicable  to  the  winch  only.  The  installation  technician
who fits the winch on another type of gantry support must
compile a new EC Declaration of Conformity after having
satisfied all the provisions of the Machinery Safety Directive
89/392/EEC  and  its  subsequent  modifications  and
supplements.

The  forces  -  referred  to  support  gantry  -  must  be  accounted  for  in
calculations related to supporting structures (scaffolding, balconies,
ceilings, etc.), made by a qualified technician.
When using supports with load  capacities other than that of the winch,
the permissible load  capacity of the weakest element of the system
must be prominently displayed.

2.1 INSTALLING THE WINCH ON SITE

The  load  access  to  the  floor  must  be  protected  by a  rail
over 1m high and a foot stop.

- Make sure that the lifting run is free from obstacles, and ensure that
nobody leans outwards on intermediate floors.
- Cordon off the ground loading area to prevent interference with work.

3. ASSEMBLY (Fig.1)
Only  competent,  trained  personnel  may  assemble  and  operate  the
winch.
Given the weight of the winch, an appropriate number of personnel
must be used for handling and installing it so as to avoid hazardous
situations.
The  maximum  working  height  (25m)  corresponds  to  the  gearmotor
position i.e. is measured from the gantry rails supporting the winch
(ref. 7).
Mount the winch on the gantry support by inserting the wheels (ref. 7,
fig. 1) in the rail guides (fig. 7) and release the brake (ref. 8, fig. 1).
Prevent detachment of the winch by fitting the end stop onto the rail.
Follow the rest of the instructions
as described in para. 7.
All  pendant  controls  have  3
pushbuttons (Fig. 3):
black: down
white: up
red: emergency stop.
Release the hook.

4. CONNECTION TO THE MAINS
- Make sure that the mains voltage is the same as that specified on
the dataplate.
- Also check that the mains voltage is within the range -5% to +5% of
the nominal voltage, when lifting at the rated load.
- The power cable must be fitted with a magnetotermic switch and a
residual current device (rcd); the earthing wire must have the same
cross-section as the power cable.
Cables must be dimensioned in proportion to both the operating current
and their length to avoid voltage drops (Table 1).
Do not use extension leads wound on drums.
- The power cable must be suitable for frequent handling and have an
abrasion-resistant sleeve (for example H07RN-F).
Connect the machine s plug to a 32 Amp EEC socket with an IP67
protection factor and tighten up the securing collar.
- The hoist is now ready for testing.

5. TESTING

Warning!  Testing  must  be  carried  out  by  qualified
personnel.  Take all necessary safety  precautions.
Warning!  The winch must be tested before use.
Before testing the winch make sure that it has been correctly
installed.

1) Lower the unloaded rope to the lower loading position by means of
the descent pushbutton, and check that at the end of its travel three
turns of rope remain on the drum.
2) No-load test.  Apply a small load (20 kg) and run a complete up/
down cycle.
Test the up, down and emergency stop buttons on the pendant control,

Fig. 2

Fig. 3

Summary of Contents for ET 300

Page 1: ...13668 IMER INTERNATIONAL S p A 53036 POGGIBONSI SIENA loc SALCETO ITALY Tel 39 0577 973 41 Fax 39 0577 983 304 ELEVATORE HOIST 1140955 110V 50Hz Manuale uso manutenzione ricambi Operating maintenance...

Page 2: ...ith this symbol DATI TECNICI TECHNICAL DATA Portata max Max capacity kg 300 Velocit media di sollevamento Lifting speed m 1 19 Altezza max di lavoro Max working height m 25 Alimentazione Nom voltage V...

Page 3: ...generano durante il funzionamento La IMER costruisce il supporto a caval letto rappresentato in fig 7 apposita mente previsto per l applicazione nei can tieri edili e progettato in modo da trasmet te...

Page 4: ...vverse forte vento o temporali in quanto il cari co non guidato 12 La posizione di comando e le condizioni di illuminazio ne devono consentire la perfetta visibilit del carico per tutta la corsa di la...

Page 5: ...nuova fune nel foro e farla usciredallasoladeltubodeltamburo quindi serrare il morsetto al lestremit lasciando circa 1 cm di fune libera fig 4 2 tira re la fune finch il morsetto ar riva a contatto c...

Page 6: ...rallelismo del disco facendo scivolare leggermente avanti e indietro lo spessimetro Se il traferro troppo grande ridurlo avvitando il dado D con chiave esagonale Se il traferro piccolo aumentarlo svit...

Page 7: ...ion of Conformity enclosed with the present manual is only valid if only IMER components are used for the winch and gantry If this condition is not complied with the Declaration is applicable to the w...

Page 8: ...al 20 Do not pull the winch on the gantry rails by means of the electric cables use the steel handle bar on the winch frame for this purpose 21 Do not leave a suspended load unattended Raise or lower...

Page 9: ...tire rope carefully every three months and in particular the ends note the results in the chart Table 2 which must be kept by the site foreman Replace the rope at least once a year 8 2 ADJUSTING THE M...

Page 10: ...ble use another lifting machine with adequate load capacity from higher up and suspend the faulty winch both at the load and at the winch attachment point Lift the faulty winch slowly off its fitting...

Page 11: ...ROKE BUTTON S4 FINECORSA SALITA UPSTROKE LIMIT SWITCH X1 CONNETTORE ALIMENTATORE MAGNET POWERING CONNECTOR X2 CONNETTORE MOTORE MOTOR CONNECTOR X3 X4 CONNETTORE CONDENSATORE CAPACITOR CONNECTOR X5 MOR...

Page 12: ...R FUNGSPROTOKOLL CONDICIONES Data Date Date Datum Fecha Funi C bles Ropes Seile Cable Macchina Machine Machine Maschine Maquine Osservazioni e firma del compilatore Observations et signature du respon...

Page 13: ...R FUNGSPROTOKOLL CONDICIONES Data Date Date Datum Fecha Funi C bles Ropes Seile Cable Macchina Machine Machine Maschine Maquine Osservazioni e firma del compilatore Observations et signature du respon...

Page 14: ...ono intercambiabili i rif 1 e rif 1 1 se in tabella presente il simbolo GB SPARE PARTS All orders for spare parts must indicate the following 1 Type of machine 2 Part number and position number of eac...

Page 15: ...2z 29 3213478 ROTORE ROTOR 30 3213669 MOTORE ELETTRICO ELECTRIC MOTOR 31 3213581 LEVA FRENO BRAKE LEVER 32 2231507 MOLLA FRENO SPRING 33 2253871 PISTONE FRENO BRAKE 34 2211600 RUOTINA WHEEL 35 222209...

Page 16: ...61 TAPPO OLIO OIL PLUG 75 3203565 GUARNIZIONE GASKET 76 2237301 DISTANZIALE SPACER 77 2222970 VITE SCREW M5x160 78 2224206 ROSETTA WASHER 6592 12x36x4 79 2229310 LINGUETTA KEY 6x6x30 80 2222505 VITE S...

Reviews: