
6 - 8
Infinium LiHa and Infinium RoMa Operating Manual - Document # 1000000110155 v00
6 - Operation
Operating in Routine Operation Mode
To switch the Infinium LiHa and Infinium RoMa on, proceed as follows:
1
Press the power ON/OFF switch for 0.5 seconds to switch the instrument on.
2
Wait until the status light in the power ON/OFF switch is lit.
ATTENTION
Before starting an application, thoroughly flush the whole liquid system. Make
sure that daily maintenance procedures have been performed. Make sure that
there are no air bubbles in the tubing and that there are no liquid droplets on tips.
3
Start up the runtime controller of the application software.
The instrument is now ready to receive commands from one of the available
application software packages.
4
Perform the necessary checks before starting a run.
Refer to cross references above.
6.3.3.1 After a Power Failure
Objects Held by
PosID, RoMa
If you want to resume operation after a power failure, it is important that objects
still held by the grippers of the PosID and the RoMa are removed manually before
switching the instrument on. Otherwise, the objects will be dropped during
instrument initialization, which may lead to a crash or spillage.
ATTENTION
In the event of power failure or an otherwise aborted run, all partially processed
samples should be discarded. Do not attempt to restart an interrupted program
unless the computer screen displays explicit instructions for resuming operation.
Fig. 6-2
Lit power ON/OFF switch