2
Item Designation
1
Filling opening lid
2
Operator panel and display
3
Handle
4
Venting grid
5
RS 232 port
6
USB port
7
Pump connector
IN
8
Pump connector
OUT
9
Power switch
10
Power socket
11
Backflow
12
Overflow
Device setup
Fig. 1
1
2
3
4
3
5
6
4
3
3
7
8
9
10
11
12