8
Preparations
Setting up:
- Place the unit on an even, stable, clean, nonslip, dry and
fireproof surface�
- Keep at least 20 cm of open space on the front and rear
side�
- The place for installation should be large enough and
provide sufficient air ventilation to ensure the room does
not warm up excessively because of the heat from de-
vice radiates to the environment�
- Do not set up the device in the immediate vicinity of
heat sources and do not expose to sun light�
- Cooling machine, pump motor and electronics produce
intrinsic heat that is dissipated via the venting grids (4)!
Never cover these venting grids!
Note:
After setting up the device, wait at least one hour
before starting the operation to avoid the damage to the
cooling system�
Connecting the tubings:
- Unscrew the union nuts and stoppers using a wrench
(AF 19) from the pump connector
IN
(8) and
OUT
(9)�
- Connect the hoses for circulating the external system to
the pump connection M 16 x 1 for
IN
and
OUT
directly
or with the olives�
Unpacking
Unpacking:
- Please unpack the device carefully�
- Any damage should be notified immediately to the shipping
agent (post office, railway network or logistics company)�
Adapter
UK
Adapter
Australia
Adapter
Europe, Switzerland
Fig. 3
Adapter
USA, China
Fig. 2
Delivery scope:
-
RC 2 GREEN control
with
WiCo
- Power cables
- Hose olive NW 8 (2 pieces)
see Fig� 2
- Hose olive NW 12 (2 pieces)
see Fig� 2
-
WiCo
holder WH 10
- OS 1�0 power supply
(for
WiCo
)
see Fig� 3
- Temperature sensor Pt 100�30
- USB 2�0 cable (micro A – micro B)
- USB 2�0 cabel (A – micro B)
- Plastic cap (for “
Overflow
” connector)
- Plastic cap (for “
Backflow
” connector)
- User guide
- Warranty card�
Fig. 4
Union nut
Stopper