background image

-10-

www.igmtools.com

Step 32.  Attach the handles to the top and bottom end on the front panel 

with the window display using (4) flat head Philip bolt, (4) 5/16” x 7/8” flat 

washers and (4) 5/16” hex nuts. Note that the head of the Philip bolt must 

be inserted from the handle with the hex nut and washer on the inside of 

the drum.

Step 33.  Take the Octagon drum front and back panels and assemble 

together by securing with (12) M4 x 12mm sheet metal screws.

Step 34. One the left and right side you will find three bolt holes. Take the 

matching side plate and secure to the outside of the panel using (6) 1/4” x 

1/2” carriage bolts, (6) 1/4” x 1” flat washers and (6) 1/4” hex nuts. Insert 

the head of the carriage bolt from the inside of the drum with the washers 

and nuts on the outside of the drum.

Step 35. Lay the drum on its side with the handle facing top. With the help 

of another person, hold the base panel with wheels up against the base of 

the drum. Using (22) M3 x 6mm Truss head Philips flat point screws and 

M3 cap nuts secure and fasten tightly. Make sure the head of the truss 

head Philip screw is on the inside of the drum. The cap nut is secured 

from the outside. Otherwise this will cause for air leakage regardless of 

silicone being applied.

Step 36. Once completing the assembly, keep the drum laying on its 

side to apply silicone (not included) to the inside of the drum, including 

the base and the top rim of the drum before the rubber seal has been 

attached to seal and prevent air leakages. You will need to use a caulking 

gun (not supplied)

Step 37.  Attach the rubber gasket to the top inner edges of the Octagon 

drum. The wider end of the gasket goes up. Use tin snips to trim any 

excess rubber gasket after completing the seal.

Step 38.  Insert the plastic debris collection bag inside the Octagon drum. 

Open and spread out the plastic bag to the corners and edges.

Step 39. Use (24) Round hd Philip bolts 3/16”*1/2” and (24) Cap nut 3/16” 

to assemble the drum insert together. Place the drum insert inside over 

the plastic bag in the Octagon drum.

Step 40. Lift the foot peddle bar. Align the Octagon drum window to the 

center point of the drum lid and push the drum in. Lower the foot peddle 

bar to seal the drum tight for normal machine operation.

Step 41. Make sure when aligning the drum that both the left and right 

side lift plates are over the topping on the foot peddle bar assembly before 

lifting the foot peddle bar up. When not aligned, the drum will not be fully 

sealed and will interfere with the air flow.

Summary of Contents for 151-PFlux3Tv2

Page 1: ...istributor IGM n stroje a stroje s r o Ke Kopanin 560 252 67 Tuchom ice Czech Republic EU Phone 420 220 950 910 E mail sales igmtools com Website www igmtools com 2022 04 04 151 PFlux3Tv2 LAGUNA Cyclo...

Page 2: ...2 www igmtools com...

Page 3: ...in the workshop If a procedure feels dangerous don t try it Figure out an alternative procedure that feels safer REMEMBER Your personal safety is your responsibility This machine was designed for cert...

Page 4: ...ace surrounding work area and non glare overhead lighting Keep the floor around the machine clean and free of scrap material oil and grease Keep visitors a safe distance from the work area Keep childr...

Page 5: ...ppliance must be connected to a grounded metal permanent wiring system or an equipment grounding conductor must be run with the circuit conductors and connected to the equipment grounding terminal or...

Page 6: ...ng or damaged parts to your dealer or distributor Prior to tool assembly and use read this manual thoroughly to familiarize yourself with proper assembly maintenance and safety procedures 5 2 General...

Page 7: ...d 6 5 16 OD18 2t flat washers Step 8 Secure the 3 upright support reinforcement plates using 12 5 16 3 4 hex bolts and 12 5 16 OD18 2t flat washers Step 9 With the help of another person lift the unit...

Page 8: ...otruding nut circled in red below It should be facing upwards when you place the bars on the floor Step 19 Ensure that the foot pedal bar is the correct side and slide the Foot pedal bar into the open...

Page 9: ...ply foam tape to the cone flange before attaching the drum lid Secure the Octagon drum lid to the cyclone funnel using 6 5 16 x 3 4 hex bolts 12 5 16 x 1 flat washers and 6 5 16 hex nuts Make sure to...

Page 10: ...side Otherwise this will cause for air leakage regardless of silicone being applied Step 36 Once completing the assembly keep the drum laying on its side to apply silicone not included to the inside o...

Page 11: ...ine off While the canister is cleaning the yellow LED light on the control panel will illuminate showing that it is in the process of cleaning There is a HEPA filter replacement indicator which is the...

Page 12: ...CT MACHINE FROM POWER REMOVING THE CANISTER FILTER 1 Release the spring loaded band clamp at the bottom of the canister filter and remove the plastic bag 2 While supporting the canister filter assembl...

Page 13: ...place bearings if needed Loud repetitive noise or excessive vibration coming from cyclone Possible Cause 1 Machine is on uneven surface 2 Damaged Unbalanced impeller 3 Loose connections 4 Impeller is...

Page 14: ...14 www igmtools com 8 POWER CONNECTIONS WIRING DIAGRAMS CONTROL PANEL POWER CONNECTIONS...

Page 15: ...15 www igmtools com AUTOCLEAN MOTOR SECONDARY JUNCTION BOX...

Page 16: ...16 www igmtools com 9 Parts breakdown Exploded Views 2021 10 14 X s I q...

Page 17: ...1 16D HEX NUT 5 16 4 16E PDCPF22201 16E DRUM CASTER 3 4 16U PDCPF22201 16U HEX BOLT 5 16 x 3 4 16 16F PDCPF22201 16F FLAT WASHER 5 16 xOD18x2t 32 16G PDCPF22201 16G HEX NUT 5 16 16 16H PDCPF22201 16HV...

Page 18: ...R ALARM 1 44 PDCPF22201 44 PHILIP HD BOLT M4 6mm 4 45 PDCPF22201 45 RUBBER HANDLE FOR DRUM INSERT 4 46 PDCPF22201 46 CONTROL PANDLE HANDLE 2 46A PDCPF22201 46A PHILIP HD BOLT M4 6mm 4 47 PDCPF22201 47...

Reviews: