11
UK
5 Installation
Before installing and removing the unit: Make sure that no pressure is
applied to the system�
►
Insert the unit in a suitable process connection�
►
Tighten firmly�
• Recommended tightening torque for ¼ - 18 NPT thread:
2���3 turns, after tightening by hand, turn further�
For leak-free installation of ¼ - 18 NPT threads, use application-
specific sealants and lubricants!
• Recommended tightening torque for 7/16“-20 UNF threads: 25���35 Nm
The sensor housing can be rotated by 345° with regard to the process connection�
Do not rotate past the end stop!