![background image](http://html.mh-extra.com/html/ifm/lk122-series/lk122-series_operating-instructions-manual_620717007.webp)
7
UK
5.1 Example configuration
Unit:
LK1222 (probe length L= 264 mm)
Medium to be detected: Mineral oil
Installation environment: Metal tank, installation to fig� 5-1
►
Install unit�
►
Observe the distances (x), (u) and (c):
x:
min� 4�0 cm
u:
min� 1�0 cm
c:
max� 14�0 cm
►
Ground sensor and tank via an electrical connec-
�
►
Observe the parameter setting sequence:
-[MEdI] = [OIL�2]
-[OFS] = (u); e�g� (u) = 2�0 cm
-[OP]: Set the overflow prevention OP at a dis-
tance (y) greater than 4�5 cm below the
mounting element�
For distances (y) smaller than 4�5 cm there
may be malfunctioning and error messages
during the adjustment process [cOP]�
Fig. 5-1
OP
c
Step increment and setting range:
Calculation aids for [OP]:
►
Adjust overflow prevention OP to [cOP]
>
The unit is ready for operation.
►
Make further settings if necessary�
►
Check whether the unit operates correctly�