![IFM KQ10 Series Operating Instructions Manual Download Page 23](http://html1.mh-extra.com/html/ifm/kq10-series/kq10-series_operating-instructions-manual_3938488023.webp)
23
UK
►
Click on [Adjust full tank]
> If no IO-Link error occurs, the adjustment was successful�
►
Check whether the unit operates correctly�
8.1.5 Adjustment of the switch points
Besides the configuration of the switch points via the corresponding parameters
, the switch points can also be adjusted by means of the level�
►
Fill or empty the tank until the requested level is reached�
►
Carry out the desired standard command
�
9 Operating and display elements
1
2
3
4
5
LED Colour Indication
①
green
status LED
②
yellow
switch point 1 (OUT 1)
③
yellow
switch point 2 (OUT2)
④
yellow
switch point 3 (OUT3)
⑤
green
LED bar graph (indication of the level)
Status LED (1) is on when the unit is connected to the voltage supply and
ready for operation. The switch point LEDs (2), (3) and (4) are on when the
corresponding output is switched� The switching outputs must be configured
accordingly
(→ 10.2.4). The LED bar graph (5) indicates the level after the