I N S T A L L A T I O N
Clearance guidelines
There is no minimum clearance on both side of the
IER
humidifier, however it is a good prac ce to
allow a clearance of 4 to 8 in [100 to 200mm] for ease of installa on and service
Allow a minimum clearance of 24in [610mm] with floor to allow for proper drain slope and drain
pipe column.
Front clearance of 30in [762mm] is required for access to the
IER
humidifier.
Top clearance is required of 12in [304mm] for access and ease of steam line connec on.
Clearances for IER with space blower
M
in
. 2
4i
n
[6
0c
m
]
Min
. 80
in
[20
0cm
]
Min. 0in
[0cm]
Min. 0in
[0cm]
Figure 8, minimum clearances for SB
Clearance guidelines
There is no minimum clearance on both side of the SB- space blower, but it is a good prac ce to
have a clearance of 4 to 8 in [100 to 200mm] for ease of installa on and service.
Front clearance of 80in [2000mm] is required for steam absorp on.
A 24in [600mm] top clearance above SB – space blower is required for access and for steam
absorp on to avoid any condensing on the ceiling.
13