iDirect Evolution 8000 Series Satellite Router Installation and Safety Manual
29
Preparing the Coax Cables
Figure 11. Cutting Technique for Removing Foil in the Braid
4. Fold the braid back over the jacket and trim the braid to the length as defined in Length
C in
and shown in
.
Figure 12. Folding the Braid
5. Flare the inner, outer braids and the outer foil shield only. Do not flare the inner foil
shield (last foil around dielectric).
6. (If using a coax stripper, skip this step.) Being careful not to cut into the copper of the
center conductor, remove the foil and cut the white color inner dielectric insulation to
the length shown under Length B in
. Remove any residue (as shown in
.
7. If the conductive foil is burred, then smooth out the burr so that the edge (area where the
dielectric material was removed) is smooth and provides a lead-in for the connector
mandrel.
8. Install connector barrel over the foil and underneath the braid.
Note: The white color inner dielectric insulation should be flush with the inner rear
surface of the connector. Refer to the picture on the right in
for an RG-11 termination.
Summary of Contents for Evolution 8000 Series
Page 8: ...viii iDirect Evolution 8000 Series Satellite Router Installation and Safety Manual...
Page 10: ...x iDirect Evolution 8000 Series Satellite Router Installation and Safety Manual...
Page 16: ...2 iDirect Evolution 8000 Series Satellite Router Installation and Safety Manual...
Page 89: ......
Page 90: ......