iDirect Evolution 8000 Series Satellite Router Installation and Safety Manual
17
4 Installing Your e8350
Satellite Router
This chapter describes the guidelines and procedures for installing the e8350 Satellite Router
at your VSAT location.
This chapter contains:
•
Tools and Supplies Required for Installation
•
Unpacking Your e8350 Satellite Router
•
Mounting the e8350 Satellite Router
•
Defining the e8350 Satellite Router Rear Panel
•
•
•
Monitoring LED Status Indicators
•
•
Repacking the e8350 Satellite Router
Note: Thoroughly review all the information in
attempting any of the procedures in the chapter.
4.1 Tools and Supplies Required for Installation
specifies recommended tools and supplies used when installing the e8350 Satellite
Router, and the tools are shown in
,
Table 8. Recommended Tools
Quantity Tool
1
Number 2 Phillips screwdriver (for rack mounting)
1
F-Connector crimping tool
1
RG-6 coax stripper
1
Coax wire cutter
1
DB-9 to RJ-45 adapter
1
Straight-through LAN cable
Summary of Contents for Evolution 8000 Series
Page 8: ...viii iDirect Evolution 8000 Series Satellite Router Installation and Safety Manual...
Page 10: ...x iDirect Evolution 8000 Series Satellite Router Installation and Safety Manual...
Page 16: ...2 iDirect Evolution 8000 Series Satellite Router Installation and Safety Manual...
Page 89: ......
Page 90: ......