87
Table 44 provides the solenoids electrical connections.
Table 44. Zero Pressure Solenoid Wiring (From/To Listing)
From
To Sensor Module, Connector A, Pin
To Breaker Box
A
N/C
Connector 1 Pin 3
B
N/C
N/C
C
7
AUTOLUBE SOL NEG
[Output]
N/C
Refer to Table 45 for a list of tools and/or consumables required for this procedure.
Table 45. Zero Pressure Solenoid Tools And Consumables List
Standard Tools
Special Tools
Consumables
PPE (Eye and Hand Protection) None
Shop Rag(s) (As Required)
Wire Cutter
Cable Ties (As Required)
Slip Joint Plyers
Zero Pressure Solenoid
<See FSG-PL- 01501, - 01502, Sheet 3>
9/16-in Wrench
Brass Adapter
Adjustable Wrench (Optional)
Loctite 580 (Or Equivalent)
If the solenoid fails or is damaged; replace the solenoid as follows.
Access
A.
Note cable tie locations, cut ONLY ties required to R&R both module brackets (in-
cluding modules), circuit breaker box, and solenoid.
B.
At modules, circuit breaker box, sensor, and solenoid, tag and disconnect electric
connectors.
C.
At top of Autolube assembly, remove both module mounting brackets.
See Figure 58.
Figure 58. Removal Of The Module Mounting Brackets
Summary of Contents for Hale Sam
Page 2: ......
Page 37: ...17 Figure 14 SAM Blue CAN Buss Architecture With Three SAM Control Centers Diagram...
Page 38: ...18 Figure 15 SAM Green CAN Buss Architecture With Three SAM Control Centers Diagram...
Page 39: ...19 Figure 16 SAM Red CAN Buss Architecture With Three SAM Control Centers Diagram...
Page 40: ...20 Figure 17 SAM System Drain And Pneumatic Diagram...
Page 41: ...21 Figure 18 SAM Speaks Diagram...
Page 42: ......
Page 58: ...38 THIS PAGE INTENTIONALLY BLANK...
Page 62: ...42 THIS PAGE INTENTIONALLY BLANK...
Page 192: ...172 THIS PAGE INTENTIONALLY BLANK...
Page 206: ...186 THIS PAGE INTENTIONALLY BLANK...
Page 220: ...200 THIS PAGE INTENTIONALLY BLANK...