FAST & FLUID MANAGEMENT
A Unit of Idex Corporation
Galileo
28
SPEED CHECK (With working machine).
Insert an empty can with a high superior to 230 mm. and close the door.
Push the key start with a high velocity.
After the closing of the plates the display has to visualize error E-7.
The machine has automatically to start the cycle with a low velocity.
12.3. Cleaning
Outside parts of the door
Use a normal not abrasive product for the cleaning of the washable domestic surfaces.
Command panel (blu part), keyboard
Use a wet cloth with neutral soap and dry without rinsing with a dried cloth or absorbent paper.
Inside parts (frame).
If there are paint leakages, clean immediately !
If necessary take away the dried part using a paddle and then use a normal not abrasive product for the cleaning of
washable domestic surfaces.
Inside parts (turning basket group).
If there are paint leakages, clean immediately !
If necessary take away the dried part using a paddle.
To clean the lubricated parts it will be sufficient to use
a cloth able to take away residual paint parts and a
little part of lubricant product.
Lubricate immediately following the procedures
below shown .
Accidental inside and/ or outside paint leakages
Clean immediately the machine and the floor in the “operator area” to avoid
sliding risks.
Empty the drainage tank unscrewing the cap indicated and picking up the paint
in a low container.
Drainage cap
Don’ t use water jet or polishing machine with high pressure to clean the mixer Galileo!
Don’ t use solvent to clean the mixer Galileo!
If the use of solvent is necessary , keep the machine switched off with the door open for 1 hour before using it.
Advised
lubricant
products
Use a yellow adhesive generic grease for uncovered gears, gradation N.G.L.I. 2.
Summary of Contents for FAST & FLUID Galileo
Page 18: ...FAST FLUID MANAGEMENT A Unit of Idex Corporation Galileo 18 13 SCHEMA ELETTRICO 115 230V...
Page 33: ...FAST FLUID MANAGEMENT A Unit of Idex Corporation Galileo 33 13 ELECTRICAL DIAGRAM 115 230V...
Page 48: ...FAST FLUID MANAGEMENT A Unit of Idex Corporation Galileo 48 13 ELEKTROSCHALTPLAN 115 230V...
Page 65: ...FAST FLUID MANAGEMENT A Unit of Idex Corporation Galileo 65 13 SCH MA LECTRIQUE 115...
Page 80: ...FAST FLUID MANAGEMENT A Unit of Idex Corporation Galileo 80 13 EI DIAGRAM 115 V 230 V...