8. INSTALLATION CONDITIONS
Before installation please make sure of the following:
Place the Galileo Mixer on a firm and leveled floor
220-240 VOLTAGE: Provide a clean, grounded outlet of 220 / 240 Volt (or otherwise specified following local
situations), which has a differential (MINIMUM 30mA), a magnetothermic protection of 16 Amp.
115 VOLTAGE: Provide a clean, grounded outlet of 115 Volt (or otherwise specified following local situations), which
has a differential (MINIMUM 30mA), a magnetothermic protection of 25 Amp. and a ground net following the rules.
Environmental conditions should be within the following limits:
Ambient air temperature
:
10 to 40
C
Relative humidity
:
30 to 90 %
During the installation it is advisable to use protective gloves to avoid hand injuries
This mixer must not be installed in an explosion proof classified working area
In case an extension is needed, please make sure it is correctly dimensioned,
according to the electrical absorption of the mixer
One mixer only (therefore no other machinary) is to be connected to a single
magnetothermic switch
9.
GALILEO KEYBOARD
A : Key “START” ( 35kg cans )
B : Key “START” ( 7kg cans )
C : Key “STOP”
D : Key (unclamps plates)
E
: Key (clamps plates)
F : Key
G : Key
H : Display
I : Emergency push button
+
+
Summary of Contents for FAST & FLUID Galileo
Page 18: ...FAST FLUID MANAGEMENT A Unit of Idex Corporation Galileo 18 13 SCHEMA ELETTRICO 115 230V...
Page 33: ...FAST FLUID MANAGEMENT A Unit of Idex Corporation Galileo 33 13 ELECTRICAL DIAGRAM 115 230V...
Page 48: ...FAST FLUID MANAGEMENT A Unit of Idex Corporation Galileo 48 13 ELEKTROSCHALTPLAN 115 230V...
Page 65: ...FAST FLUID MANAGEMENT A Unit of Idex Corporation Galileo 65 13 SCH MA LECTRIQUE 115...
Page 80: ...FAST FLUID MANAGEMENT A Unit of Idex Corporation Galileo 80 13 EI DIAGRAM 115 V 230 V...