23
Systemiser SE -
Installation
INSTALLATION
SIDE FLUE OUTLET
27 MOUNTING THE BOILER
FOR FLUE LENGTHS GREATER THAN 600mm REFER TO FRAMES 34, 35 & 36 - FLUE EXTENSION DUCTS
28 CUTTING THE FLUE - For flue lengths 114 to 600mm
ONLY
1.
The flue cut length is calculated as follows:
a.
Measure and note the wall thickness X
b.
Add dimension H, measured in Frame 22.
c.
For right hand side flue add 188mm (7
3/8
")
d.
For left hand side flue add 61mm (2
3/8
")
i.e.
X + H + 188mm (7
3/8
") for RHS
X + H + 61mm (2
3/8
") for LHS
2.
Measure from the groove and cut the
tube.
IMPORTANT.
Measure from the groove marked 'TOP'
not
the larger groove.)
3.
To ensure the tube is cut square, mark
the flue all the way round.
4.
Cut to length, using the cardboard
support aid.
5.
Remove the cardboard support and
remove any burrs.
Lift the boiler onto the wall mounting piping frame, as shown.
Summary of Contents for Systemiser SE
Page 1: ......
Page 31: ...31 Systemiser SE Installation INSTALLATION INSTALLATION 42 PICTORIAL WIRING DIAGRAM...
Page 57: ...57 Systemiser SE Installation SHORTS LIST OF PARTS 86 SHORT PARTS LIST...
Page 60: ...60 Systemiser SE Installation 89 BOILER CASING ASSEMBLY SHORT LIST OF PARTS...
Page 61: ...61 Systemiser SE Installation...