29
Harrier GTE -
Installation & Servicing
INSTALLATION
har7026
24
1
2
2
42 NAMEPLATE AND LEVELLING
1. Affix the identification plate and CE label
(supplied in the instructions bag) on the
casing (on the left or right-hand side) in
an easily accessible location.
2. Check the boiler for level and adjust the
feet if necessary.
43 CONTROL PANEL (General)
Electrical control panel, equipped with temperature control.
The control panel carton contains:
1 control panel complete with burner connection harness.
The control panel incorporates a boiler thermostat controller,
a thermometer and a safety thermostat.
The boiler thermostats - one controls the maximum boiler
operating temperature. The other controls the high/low
operation if a 2 stage burner is fitted.
The safety thermostat (with manual reset) - if the boiler
temperature rises abnormally (110ºC), the safety thermostat
cuts off the burner electricity power supply.
WARNING. In this case, you must call your installer
Refer to Frames 55 or 57 for specific details of Standard or Deluxe panels.
INST
ALLA
TION
For latest prices and delivery to your door visit MyTub Ltd - 0845 303 8383 - www.mytub.co.uk - [email protected]