22
Harrier GTE -
Installation & Servicing
INSTALLATION
30 INSTALLING THE INSULATING MATERIAL
1. Models GTE 5, GTE 6 and GTE 7.
Place the insulating material over the
boiler, ensuring the lugs protrude
through the top, wrap down the sides
and tuck underneath.
2. Models GTE 8 and GTE 9. After fitting
the front insulation similarly place the
rear section.
3. Secure the two sections together
using the clips provided.
4. All Models. Place the rear insulation
into position ensuring it fits neatly
over the pipe connections and flue
cleanout box.
5. Secure at the top and sides using the
clips provided.
har7009
4
5
1
har7011
140
90
har7008
3
2
INST
ALLA
TION
For latest prices and delivery to your door visit MyTub Ltd - 0845 303 8383 - www.mytub.co.uk - [email protected]