EVOMAX - Low Height Frame & Header Kits

2.2  MULTIPLE BOILER INSTALLATIONS 

When sizing multiple appliance installations, the minimum and maximum system heat load requirements need to be matched to the 

minimum and maximum appliance load capabilities. 

These water header & pump kits are design to supply the optimum water flow around the appliance water circuit only and must be used 

in conjunction with a suitably sized low loss header (mixing header). 

2.3  HYDRONIC ISOLATION: LOW LOSS HEADER

A low loss header allows flow separation within a hydronic system.
This allows two flow circuits to operate with their own flow and pressure drop environments whilst effectively transferring heat to its 

adjoined water circuit.

This enables the modern high resistant, high efficiency boilers to operate under their optimum conditions, while the main heating circuit 

operates to its own controlled optimum requirements.

2.4  OUTPUT CONTROL

All pumps provided are designed to be wired to the appliance to allow a controlled pump over run.

If using an external pump control system the capability of a timed pump over run signalled provided by the appliance must be 

maintained at all times.
External sequencers can be used with these appliances and are available as an option.

2.5  GAS SUPPLY

The 30, 40, 60 & 80 kW boilers are suitable for use with both natural gas and propane, category ll2H3P. The 100 120 & 150kW boiler 

are only available for natural gas l2H.

Connection to the gas supply must be in accordance to with all the applicable regulations.

A single frame and DN50 water header kit will require the gas inlet to be made up to the gas tap provided, connecting it to the inlet of 

the appliance.

2 and 3 boiler units will be supplied with a 2” gas header and all the necessary components and pipe work to connect it to the 

appliances.

Note: Test points are provided at each end of the 2” gas header. The test point nearest to the gas inlet is intended to be used as the 

appliance inlet pressure point.

2.6 ASSEMBLY

The frames must be located in a suitable place that affords a flat and level floor area of suitable load bearing capacity. Care must be 

taken when locating the frames that space is available for the servicing, installation and maintenance of the appliance and all of the 

associated connections and equipment. (See Appliance manuals)

When using multiple frames they must be bolted together and where necessary secured to the floor.

2.7  SAFE HANDLING

Installation may require 2 or more operatives to move it to its installation site, remove it from its packaging base and during movement into its 

installation location. Manoeuvring may include the use of a sack truck and involve lifting, pushing and pulling.
Caution should be exercised during these operations.

Operatives should be knowledgeable in handling techniques when performing these tasks and the following precautions should be considered:

•  Grip the boiler at the base.

•   Be physically capable.

•   Use personal protective equipment as appropriate, e.g. gloves, safety footwear.

During all manoeuvres and handling actions, every attempt should be made to ensure the following unless unavoidable and/or the 

weight is light.
• Keep back straight.

• Avoid twisting at the waist.

• Avoid upper body/top heavy bending.

• Always grip with the palm of the hand.

• Use designated hand holds.

• Keep load as close to the body as possible.

• Always use assistance if required.

Summary of Contents for DN50

Page 1: ...be assured conform to the safety and performance specification that we require Do not use reconditioned or copy parts that have not been clearly authorised by Ideal For the very latest copy of literature for specification and maintenance practices visit our website www idealcommercialboilers com where you can download the relevant information in PDF format ...

Page 2: ... 2 General Description Of Systems 4 3 System Components 6 4 Installation Drawings For Boiler Systems 8 5 Installation Procedure 10 6 Electrical Connections 14 7 Commissioning And Testing 14 IMPORTANT THESE KITS MUST ONLY BE USED IN CONJUNCTION WITH LOW LOSS HEADERS IDEAL PROVIDE 3 OPTIONAL LOW LOSS HEADER KITS DN50 UIN 209394 DN65 UIN 209395 DN80 UIN 252437 ...

Page 3: ...f products These systems are adapted to incorporate the use of low loss headers and optional sequencer control systems All these kits are supplied with the relevant number of energy efficient pumps and necessary parts needed to connect these kits to the separately purchased Evomax appliances Check the kit contents with the list below UNPACKING Kit Contents Frame Water Header Hardware Pack Connecti...

Page 4: ...cessories DN50 DN65 DN80 209394 209395 252437 Note All boilers need to be sized in accordance to the total required heat load and the modulation capabilites of the appliances Note When fitted with 150 appliance D 666 from rear frame bolt to front of boiler A single boiler system is defined as fitting one appliance on a single frame with a DN50 water header A two and three boiler system cascade is ...

Page 5: ...let to be made up to the gas tap provided connecting it to the inlet of the appliance 2 and 3 boiler units will be supplied with a 2 gas header and all the necessary components and pipe work to connect it to the appliances Note Test points are provided at each end of the 2 gas header The test point nearest to the gas inlet is intended to be used as the appliance inlet pressure point 2 6 ASSEMBLY T...

Page 6: ...0 209394 DN 65 209395 DN 80 252437 3 5 BOILER SHUNT PUMP The pumps supplied with these kits are design to provide the optimum flow around the appliance water circuit ensuring the maximum flow rates are contain within the design constrains of the appliance It is not recommended to fit additional pumps directly to the appliance circuit unless they have been designed to ensure the maximum permissible...

Page 7: ...eader Kits IMPORTANT POINTS Before commencing installation MOUNTING FRAME S MUST STAND ON A FLAT AND LEVEL FLOOR WHEN ASSEMBLING THE HEADER KIT THE HEADER MUST BE BOLTED TO THE FRAME BEFORE THE FLEXIBLE HOSE CONNECTIONS ARE MADE ...

Page 8: ... 4 1 GENERAL The boiler systems are available in side by side format 1 to 3 boilers in a linear configuration mounted on a free standing frame These boiler and cascade systems are sized to provide a flow and return differential of 20º T 4 2 INSTALLATION DRAWING WITH 1 30 150 BOILER ...

Page 9: ...9 EVOMAX Low Height Frame Header Kits 4 3 INSTALLATION DRAWING WITH 2 30 150 BOILERS 4 4 INSTALLATION DRAWING WITH 3 30 150 BOILERS ...

Page 10: ...ace the frame kit sections in the required position and bolt them together at the top and bottom with the bolts nuts and washers provided 2 Drill and fit the required floor bolt s not provided through the hole provided in the front of the frame feet Note this must be done before fitting water headers 2 1 ...

Page 11: ...fe place See appliance manual 5 Fit condensate trap and pipe work See appliance instruction pipe runs must have 1 20 slope away from the appliance 6 Fit gas connection tap 7 Fit tee with pre assembled non return valve and pump union to the return ensuring the flow arrow is point toward the base of the appliance 8 Attach the drain tap to the return tee ensuring the connection and activation point a...

Page 12: ...mp connection is fitted 2 Check taps are operational 3 Fit water header blanking flanges and gaskets 1 Fit the blanking cap to the required end 2 Fit female to 22 compression fitting to stub pipe on the side of the gas header 3 Place the gas header in the pre cut cradle to the rear of the header 2 1 2 3 ...

Page 13: ...rmally control by associated control sequencers 1 Locate header into required position on the frame legs 2 Align bolt holes and fit bolts loosely 3 Connect the return pump union to the pump ensuring the correct rubber washer is used 4 Connect the flow connector to the boiler flow pipe adaptor ensuring the fibre washer provided is correctly fitted 5 Tighten the heater bolts on to the frame 6 Ensure...

Page 14: ...shunt pumps are wired to the boiler in order to ensure the boiler pump overrun facility is provided 1 Electrical and gas safety checks must be carried out on completion of installation as with individual boiler commissioning 2 Pump setting adjustment Follow instructions on pump type shown below Adjust red control potentiometer fully clockwise to position 8 as shown below This is the constant press...

Page 15: ...15 EVOMAX Low Height Frame Header Kits ...

Page 16: ...sues a policy of continuing improvement in the design and performance of its products The right is therefore reserved to vary specification without notice The Ideal Boilers Technical Training Centre offers a series of first class training courses for domestic commercial and industrial heating installers engineers and system specifiers For details of courses please ring 01482 498 432 Ideal Installe...

Reviews: