Classic SE
FF
-
Installation & Servicing
35
SERVICING
66 AIR PRESSURE SWITCH (APS) REPLACEMENT
1.
Refer to Frame 56
2.
Remove the 2 silicon rubber tubes from the fan sensing points.
3.
Disconnect the fan leads.
4a. Rear flue.
Slacken the M4 screw securing the flue connector to the
fan. Disconnect the connector from the fan and slide into the flue.
4b. Side or top flue.
Slacken off two M4 screws securing the flue elbow
and flue connector. Disconnect the flue connector from the elbow
and slide into the flue. Remove the flue elbow.
5.
Disconnect the silicon rubber tube from the rear of the collector hood.
6.
Slacken the two M5 nuts on the front tie rods, releasing the tie rods
from the combustion chamber.
7.
Remove the M5 central fixing screw at the rear of the collector hood
and remove collector hood / fan assembly.
8.
Remove the three M4 screws retaining the fan to the collector hood.
9.
Fit the new fan and reassemble in reverse order, ensuring the fan
leads and 3 sensing tubes are reconnected.
10.
Check the operation of the boiler.
65 FAN REPLACEMENT
5.
Disengage the PCB from the mounting posts and withdraw
from the control box.
6.
Fit the new PCB and reassemble in reverse order.
7.
Check the operation of the boiler.
Fuse.
To change the fuse, prise it out of the holder and disengage
the fuse. Refer to Frame 74 for fuse location.
1.
Refer to Frame 56.
2.
Remove the APS fixing screw.
3.
Remove both sensing tubes from the APS.
4.
Remove the 3 electrical connections from the APS.
5.
Fit the new APS and reassemble in reverse order.
6.
Check the operation of the boiler.
67 PRINTED CIRCUIT BOARD (PCB) REPLACEMENT
Note.
Refer to Frame 74 of 'Exploded Views' for
illustration of the procedure detailed below.
1.
Refer to Frame 56.
2.
Remove the fixing screws and swing the control box
down into the servicing position.
3.
Disconnect the detection lead from the PCB.
4.
Unplug all the Molex connectors from the PCB.
68 COMBUSTION CHAMBER INSULATION REPLACEMENT
1.
Refer to Frame 56.
2.
Remove the burner and air box assembly.
Refer to Frame 51.
3.
Remove the 4 tie rods.
4.
Remove the combustion chamber.
5.
Remove the 2 side panel retaining brackets.
6.
Remove the side insulation panels.
7.
Remove the front and rear
insulation panels.
8.
Fit the new front and rear
insulation panels.
9.
Fit the new side panels and
retain with the brackets and
screws previously removed.
10.
Reassemble in reverse order.
SER
VICING
200544-5.pmd
20/02/2008, 13:27
35