![IDEAL INDUSTRIES CREE LIGHTNING ZR-RK Series Installation Instructions Manual Download Page 3](http://html.mh-extra.com/html/ideal-industries/cree-lightning-zr-rk-series/cree-lightning-zr-rk-series_installation-instructions-manual_617107003.webp)
3 of 5
LPN00825X0003A0_A
STEP 1:
Disconnect power to circuit by turning circuit
breaker OFF before installation.
STEP 2:
Wire luminaire per
“Electrical Connections”
section and tuck all leads into the back of the
existing luminaire housing. Ensure that no
leads are pinched. See
Figure 5.
STEP 3:
Secure the door assembly by gently swinging
the door up into the other side of the luminaire
and then locking in place with the locking
latches riveted on each end off the assembly
door frame. See
Figure 4.
STEP 4:
Switch the circuit breaker on.
STEP 5:
Make sure the WIM blue LED has a double
blink pattern. If not, please proceed to
Troubleshooting section. Otherwise, you can
proceed to commission the zone controller.
Please refer to the Smartcast
®
documentation
for details. See
Figure 6.
RESET
STEP 1:
Actuate RESET button through the access hole.
Press and hold Reset button until the LED
flashes fast (approximately 5 seconds). See
Figure 6.
STEP 2:
Release the Reset button for 1 second (Fast
flashing continues). Press and hold Reset for 1
second until fast flashing stops. If the blue LED
does not respond with the two-blink sequence,
please repeat the RESET procedure.
CLEANING LENS
STEP 1:
Locate the end cap with the arrow marks on it,
indicating that the end cap is removable. See
Figure 7.
STEP 2:
Squeeze the middle of the lens while grabbing
the lens section next to the end cap and pull
lens and end cap together downward gently
until end cap just clears luminaire (about 3” to
4” from original position). See
Figure 8.
STEP 3:
Disengage the other end of the lens from the
other end cap. Once lens is removed perform
cleaning. See
Figure 8.
STEP 4:
After cleaning is complete insert lens back
into fixed end cap. Push the removable end cap
upward into the housing and using a gentle
rocking motion engage the end cap to retention
clip. Check removable end cap for any visible
gap between the end cap and end panel. If
necessary push end cap against the end panel
to eliminate gaps.
panel to eliminate gaps.
In 1’ X 4’ and 2’ X 4’ products, make sure lens is
snapped under lens retention clips in middle of
housing. See
Figure 9.
7
End Cap
Arrow Marks
9
Fixed End Cap
Arrow Marked
End Cap
DO NOT Rotate
Lens Into This
Zone
8
1
2
1
2
5
6
Ambient Light Sensor /
Blue LED indicator
Motion Sensor
Reset Button
SMARTCAST
®
SETUP
NOTE:
Cree Lighting recommends reviewing the
Cree Lighting SmartCast Technology Wireless
Deployment Guide prior to installing luminaires
with Cree Lighting SmartCast Technology.
NOTE:
• Visit Cree Lighting’s website for the guide:
www.creelink.com/exLink.asp?23613564O
H88E44I39771048&view=1
NOTE:
SmartCast luminaires must be installed
on unswitched AC power. Constant power is
required to maintain all luminaires on the
Smartcast network.