Section 5 - Package Installation

9

Installation and Servicing

5.1  PHEX PACKAGE LAYOUT

 557 

 30-90 

 1545 

 685 

 550 

 685 

5.2  POSITIONING

Careful consideration must be given to the installation 

tolerances to prevent kinked or non-fitting  connections.
If the package is being installed as a retrofit to replace an 

existing appliance care should be taken to ensure that the 

position of the flue connection on the new appliance is 

consistent with the existing equipment.

 IMPORTANT: Example shown is 

for the Evomax 2 150 kW boiler. Note 

that the position of the flue connection 

for the boiler will vary depending on 

the model. Refer to the installation 

manual for the appliance.

5.3  LEVELLING

Levelling feet are provided to allow height adjustment 

of the package. Height adjustment can be used for 

levelling and ensuring that connections to existing flue 

systems are correct.

Stainless steel construction of the 

plate heat exchanger permits high flow 

velocities through plate connections. 

Secondary pipework typically requires 

increase in size compared to PHEX 

connection size to meet guidance on flow 

velocities.

Increase from a plate connection should 

be created before bends or changes 

of direction in secondary pipework. 

Pipework on the secondary side of the 

plate should be sized by flow rate / 

temperature differential of the secondary 

system.

Maximum permissible flow rate through 

the secondary side of the plate is 2.8 l/s 

producing 41 kPa resistance.

Secondary 

Flow (1")

Secondary 

Return (1")

Summary of Contents for EVOMAX 2 30

Page 1: ...e Do not use reconditioned or copy parts that have not been clearly authorised by Ideal Heating For the very latest copy of literature for specification and maintenance practices visit our website ide...

Page 2: ...kaging and product in a corresponding recycle centre Do not dispose of the unit with the usual domestic refuse Do not burn the product Remove the batteries Dispose of the batteries according to the lo...

Page 3: ...2 1 Plate Heat Exchanger Kit Options 5 2 2 Hydraulic Separation Plate Heat Exchanger 5 2 3 Output Control 5 2 4 Gas Supply 5 2 5 Safe Handling 5 Section 3 Package Contents Components 6 3 1 Package Com...

Page 4: ...arate the boiler hydraulically primary from an existing heating hot water system secondary See appliance manuals for the flue configurations for the range of appliances using this kit 150 kW boilers m...

Page 5: ...he range of available Evomax 2 boilers The kit is based on a low height frame and allows hydraulic separation of the boiler from the secondary system in a compact envelope Consider the modulation rang...

Page 6: ...PIPEWORK 001 Gas Connection Kit 002 Mounting Frame Fabrication 003 Evomax 2 Low Height 1 5 in Return 004 50 mm Square Plastic Tube Insert M12 Threaded 005 Adjustable Foot 50 x M12 x 100 006 Return Ma...

Page 7: ...PZ assembly note direction of flow Additional stop valve Hosepipe disconnect after filling Water Supply Temporary Hose disconnect after filling Hose unions G3 4 Valve 4 A spring loaded non adjustable...

Page 8: ...be bolted secured to the floor after the connections are made to the boiler or system pipework from the package to allow for minor adjustments of the position of the package MOUNTING FRAME MUST BE SEC...

Page 9: ...manual for the appliance 5 3 LEVELLING Levelling feet are provided to allow height adjustment of the package Height adjustment can be used for levelling and ensuring that connections to existing flue...

Page 10: ...e to drain following the recommendations contained in the boiler Installation instructions 5 4 6 Pressure Relief Connection Ensure the boiler pressure relief valve is connected and piped to safety 5 4...

Page 11: ...Interlock Pump control 0 10V OpenTherm Header GND S4 GND Mains Supply Demand inputs 230V 50Hz Interlock 230V 50Hz Auxiliary MFR1 MFR2 MFR3 OT2 S1 GND S2 GND S3 C OT2 C NO I0 I1 PWM GND 10V 10V GND OT1...

Page 12: ...dual boiler commissioning UPMXXL for use with Plate Heat Exchangers 1 per boiler EVOMAX 2 IMPORTANT PWM Control to be wired directly to the boiler MUST be wired in last For pump and external pump cont...

Page 13: ...Notes 13 Plate Heat Exchanger Package...

Page 14: ...Notes 14 Plate Heat Exchanger Package...

Page 15: ...Notes 15 Plate Heat Exchanger Package...

Page 16: ...deal Technical Helpline 01482 498663 Ideal Consumer Helpline 01482 498660 Ideal Parts 01482 498665 idealheating com Ideal Boilers Ltd pursues a policy of continuing improvement in the design and perfo...

Reviews: