6
Harrier GTS -
Installation & Servicing
GENERAL
1 BOILER DIMENSIONS
2 BOILER CLEARANCES
The minim
um dimensions as indicated must be respected
to ensure good access around the boiler.
Note.
To allow the inlet of the combustion air, the boiler
room must be adequately ventilated, the section and the
location of which must comply with local recommendations.
Refer also to Frame 3.
The boiler must be positioned so that there is enough
space available to allow the following:
•
Access around the boiler for servicing.
•
Space to open the boiler front door.
•
Space to access the burner.
Recommended minimum clearances are as shown.
Rear
1000mm or adequate space to make the flue
connections and access to the flue sample point,
drain connection, flue and smokehood cleanout
doors and any safety or control devices.
Sides
One side may be 100mm the other side must
be 200mm plus the burner projection or 500mm
whichever is the greater to allow the burner door
to be swung open and maintain access to the
rear. In multiple boiler installations both sides may
be 100mm except at one end consideration must
also be given to the burner door hinge position and
consequent clearance for access to the rear.
1017
827
137
11
5
B
OR
11
92
137
387
H
105
C
A
L
153
D
800
53
98
153
195
P
103
103
597
har9077
1.5m
1m
1.19m
0.15m
A
B
0.5m
0.5m
0.8m
ha
r9
07
8
Dimension Boiler GTS 5 GTS 6 GTS 7 GTS 8 GTS 9
A
mm 1000 1160 1320 1480 1640
B Standard Control Panel mm 105 105 105 105 105
Boiler
GTS 5
GTS 6
GTS 7
GTS 8
GTS 9
A
130
130
130
130
130
B
105
105
105
105
105
C
165
165
165
165
165
D
738
738
738
738
738
H
1297
1297
1297
1297
1297
L
1151
1311
1471
1631
1791
P
650
810
970
1130
1290
OR
180
180
200
200
200