![ideal commercial HARRIER GTS 5 Installation And Servicing Download Page 25](http://html1.mh-extra.com/html/ideal-commercial/harrier-gts-5/harrier-gts-5_installation-and-servicing_3659364025.webp)
25
Harrier GTS -
Installation & Servicing
INSTALLATION
har9087
34 ASSEMBLING THE REAR PANEL
1.
Place the panel in position
2.
Engage the plastic push clips.
3.
Secure the panel at each corner with
two self tapping screws and shakeproof
washers.
Note
.
If a pressure relief valve has already been
fitted in the flow connector or if the panel is
being replaced on a completed installation, the
top centre piece of the panel may be removed.
35 ASSEMBLING THE FRONT TOP PANEL
1. Engage the notches in the top panel onto
the location buttons and slide forwards.
2
1
3
har9086
INST
ALLA
TION