64
Installation and Servicing
SECTION 3 - SERVICING
3.34 HEAT EXCHANGER REPLACEMENT
1. Refer to Sections 3.2 & 3.3.
2. Close the isolating service valves and drain the (CH) boiler. Refer to
Section 3.24.
3. Remove the condensate trap. Refer to Section 3.20.
4. Remove the Burner & Fan assembly. Refer to Section 3.4.
5.
Remove the securing clips to disconnect the flow and return pipes
below the heat exchanger.
6. Disconnect the condensate pipe from the sump.
7. Disconnect the thermal fuse lead.
8.
Remove the horseshoe bracket and lift up the flue turret.
9.
Remove the securing screws and disconnect the flue outlet.
10.
Remove the 4 screws securing the heat exchanger fixing brackets.
11.
Remove the heat exchanger forwards, lifting to clear the flow and
return pipes.
12.
Refit in reverse order. Ensure all wires and harnesses are in their
correct position in order to prevent damage to them.
13.
Open the isolating valves and refill the CH system. Refer to Section 2.15
.
14. Ensure all gas valve connections are gas tight with a gas soundness
check up to the gas control valve.
15. Check the operation of the boiler. Refer to Sections 2.24 to 2.27.
5
7
10
6
9
SER
VICING
Summary of Contents for VOGUE MAX COMBI 26
Page 4: ...4 Installation and Servicing...
Page 6: ...6 Installation and Servicing...
Page 74: ......