Installation and Servicing
SECTION 3 - SERVICING
3.25 PRESSURE GAUGE RENEWAL
3.26 SAFETY RELIEF VALVE RENEWAL
1. Refer to Sections 3.2 & 3.3.
2. Close the isolating service valves
and drain the (CH) boiler. Refer to
Section 3.24.
3. Remove the clip retaining the
pressure sensor capillary.
4. Remove the pressure sensor
capillary.
5. Remove the two screws securing the
controls housing lid. Refer to Section
3.21.
6. Remove the electrical cover at the
clips indicated. Refer to Section
3.21.
7. Release the clip retaining the
pressure gauge and remove
the gauge, drawing the capillary
carefully through the rubber
grommet and out of the boiler.
8.
Refit in reverse order. Refill the CH
system. Refer to Section 2.15.
9. Check the operation of the boiler.
Refer to Sections 2.24 to 2.27.
1. Refer to Sections 3.2 & 3.3.
2. Close the isolating service valves
and drain the (CH) boiler. Refer to
Section 3.24.
3. Remove the burner & Fan assembly,
if required for access. Refer to
Section 3.4.
4. Undo the Safety Relief Valve outlet
retaining nut. (retaining the washer)
5. Remove the securing clip at the rear
of the valve body.
6. Withdraw the valve vertically.
7.
Renew the valve and refit in reverse
order.
8.
Refill the CH system. Refer to
Section 2.15.
9. Check the operation of the boiler.
Refer to Sections 2.24 to 2.27.
4
3
7
6
SER
VICING
Summary of Contents for VOGUE MAX COMBI 26
Page 4: ...4 Installation and Servicing...
Page 6: ...6 Installation and Servicing...
Page 74: ......