Installation & Servicing
INSTALLATION
nm7898
2
1
3
27 CONNECTING THE FLUE TO THE BOILER
Note.
Before fitting the flue turret fill the condensate
trap within the boiler by pouring a
cupful of water into flue outlet A.
Make sure the plastic
cap is removed from
the end of the
condensate drain
adapter.
Take care to ensure
that the water is only
poured into the flue
outlet, and does not spill
into the boiler casing.
1.
Locate the flue into the turret.
2.
Insert the flue assembly through the prepared hole in
the wall.
3.
Locate the flue turret on the top of the boiler, ensuring that
the turret gasket is in place. Check that the flue seal (at A)
located in the top of the flue manifold is secure and giving
an effective seal.
4.
Secure the flue turret on top of the boiler by inserting the
open ends of the turret clamp under the 2 studs and fixing
it in the middle with the single M5 x 10mm pozi-hex screw
provided.
5. Flues over 1 metre long.
Fix the flue support bracket to the wall, using the wall plug
and wood screw. For standard installations use the short
wood screw.
If the stand-off option is used, secure the support bracket
using the spacer bracket and long wood screw.
NB.
The space bracket will utilise one fixing hole only whilst
used in conjunction with the stand-off option.
26 MOUNTING THE BOILER
1.
Lift the boiler onto the wall mounting plate, as
shown.
2.
Check the boiler alignment using a spirit level
and adjust as necessary with the jacking screw.
3.
Align the hole in the jacking plate with the pre-
drilled hole in the wall and fix in position with the
No.10 x 2" screw provided.
4.
Fit condensate union connection
INST
ALLA
TION