
16
icos
-
Installation & Servicing
INSTALLATION
195mm 195mm
Rear flue length X
Side flue length L
Jacking screw
160 mm
Ecl 1
1
77
160 + S = 193mm
13 FRONT AND BOTTOM PANEL REMOVAL
IMPORTANT.
The boiler MUST be installed in a vertical position
Dimension X
- Wall thickness.
Dimension L
- Wall thickness plus boiler spacing.
Dimension S
- Stand-off frame depth = 33mm.
1.
To remove the front panel remove the 2 screws from the
bottom panel.
2.
Lift the panel up and off the top pegs.
3.
To remove the bottom panel remove the 2 screws.
4.
Pull the RH side of the panel down. Slide it to the right
and withdraw.
14 DETERMINING THE FLUE LENGTH AND FLUE PACKS REQUIRED
FLUE KITS
Pack B
- supplied as standard
Finishing Kit
- supplied as standard
Pack D
- optional extension kit for side flue or rear flue outlet.
Refer to 'Flue Extension Ducts'
Note.
MAXIMUM FLUE LENGTHS:
HORIZONTAL FLUE
- 6M
ROOF FLUE KIT
- 8M
POWERED VERTICAL FLUE KIT - 14M TOTAL
60/60 TWIN FLUE KIT
- 20M TOTAL AIR PLUS FLUE DUCT
80/80 TWIN FLUE KIT
- 46M TOTAL AIR PLUS FLUE DUCT
90
O
ELBOW KIT 60/100 (EQUIVALENT FLUE LENGTH RESISTANCE = 1M)
45
O
ELBOW KIT 60/100 (EQUIVALENT FLUE LENGTH RESISTANCE = 0.6M)
Notes.
1
.
The flue duct MUST be inclined at 1.5 degrees to the horizontal to allow condensate to drain back into the boiler and out
through the condensate drain.
2.
If the boiler is to be installed with downward piping routed behind the boiler then the optional stand-off kit should be used.
Care must be taken when cutting the ducts and marking the wall to suit this condition.
nm 7802
3
1
Total Flue length dimension
Flue
Rear flue
Side flue
Extra packs
dim. X+160
dim. L+195
required
Up to
650 mm
Up to
650 mm
none
Up to 1600 mm
Up to
1600 mm
Pack D - 1 off
Up to 2550 mm
Up to
2550 mm
Pack D - 2 off
Up to 3500 mm
Up to
3500 mm
Pack D - 3 off
Up to 4450 mm
Up to
4450 mm
Pack D - 4 off
Up to 5400 mm
Up to
5400 mm
Pack D - 5 off
Up to 6000 mm
Up to
6000 mm
Pack D - 6 off
INST
ALLA
TION
200212-10.pmd
9/5/2005, 8:58 AM
16