9
Mexico Super FF440 - FF480 -
Installation & Servicing
INSTALLATION
5
BOILER CASING REMOVAL
The boiler is supplied fully assembled in Pack A,
together with a standard flue assembly for lengths
up to 600mm (23
1/2
") rear or side flue outlet in
Pack B.
Unpack and check the contents.
4
UNPACKING
complete boiler assembly
BOILER HARDWARE PACK
!
1" BSP plugs - 5 off.
!
1" x
1/2
" BSP reducing bush - 1 off.
!
Cable strap - 2 off.
!
Distributor tube
!
Thermostat pocket -1 off
!
Thermostat clip (RS 3/50, RS 3/60,
RS 3/70 & RS 3/80 only) - 1 off
!
Thermostat retaining pin - 1 off
To install the boiler the casing MUST be removed.
1.
Undo the 2 screws and lift off the lower front panel.
2.
Remove 2 screws and lift off the grille assembly.
3.
Disconnect the in-line electrical connector between
the control box and the PCB box.
4.
Remove the thermostat phial from the pocket as
shown in Frame 6.
5.
Remove the 2 screws securing the control panel and
pull down to release the tabs from under the top
panel.
6.
Remove the 2 screws securing the top panel to the
side.
FLUE PACK. Pack B Contents
!
Duct cutting support, 2 off (cardboard )
!
Terminal wall plate, 1 off.
!
Terminal grille assy., 1 off.
!
Polyurethane foam seal 400 lg., 1 off.
!
No. 8 x 8 lg. Pozi pan hd. screws, 3 off.
FLUE HARDWARE PACK
PACK A CONTENTS
!
Complete boiler assembly
!
These Installation & Servicing/Users Instructions
!
The Hardware Pack (listed separately below)
!
Template
INST
ALLA
TION
!
Flue extension tube (rear)
!
Flue extension tube (side)
!
Flue extension tube (top)
!
Elbow
!
Sealing ring
!
M5 wing nuts - 3 off
!
No.10 x 2” Rd. Hd.
woodscrew - 8 off.
!
Wall Plug - brown - 8 off.
!
Side outlet plate
!
28mm Comp nut - 1 off.
!
28mm olive - 1 off.
INST
ALLA
TION
200939-1.p65
3/1/2004, 4:33 PM
9