15
Mexico Super FF440 - FF480 -
Installation & Servicing
INSTALLATION
SIDE FLUE OUTLET
1.
To determine the position for the
foam seal measure the wall
thickness and mark it onto the flue,
measuring from the groove near the
terminal.
2.
Wrap the self-adhesive foam strip
round the flue, ensuring that the
foam is on the terminal side of the
line. This seals the gap between the
flue and the wall.
1.
Fit the boiler sealing ring inside the outer flue duct.
Ensure the boiler sealing ring is fully engaged.
Ensure the notch aligns with the groove on the outer flue
duct. This ensures correct alignment of the flue terminal.
2.
Drill 3 holes 3.2mm (1/8") dia. through the outer flue
duct and boiler sealing ring.
Do not drill the inner flue
duct
.
3.
Insert the self tapping screws, provided, in order to fix
the boiler sealing ring in position.
19 CUTTING THE FLUE
-
wall thicknesses of 114 to 600mm
1.
Measure and note the wall thickness X.
2.
Mark the wall thickness onto the flue.
3.
To ensure the tube is cut square, mark
the flue all the way round.
4.
Cut to length X, using the cardboard
ring for support.
5.
Remove cardboard ring and remove
any burrs.
21 FITTING THE FOAM SEAL
20 FITTING BOILER SEALING RING TO THE FLUE
200939-1.p65
3/1/2004, 4:33 PM
15