INSTALLATION
13
Mexico Super CF495 - CF4140
-
Installation & Servicing
MEX 2139
8
9
7
9
12
9
BOILER CASING REMOVAL
To install the boiler the casing MUST be removed.
Mex
60
45
Side view of
boiler sections
showing the
baffle
arrangements
CF 4140
CF 495
CF 4120
MEX 2221
Baffles
1.
Remove the flue cleanout cover.
2.
Ensure that the baffles are fully inserted in the flueways.
10 CHECKING THE FLUEWAY BAFFLES
1.
Undo the 2 screws and lift off the lower front panel.
2.
Remove 2 screws and lift off the grille assembly.
3.
Disconnect the in-line connector on the PCB lead.
4.
Remove the Burner On neon cable from the back of
the control panel.
5.
Unplug the in-line connector to the TTB thermostat.
6.
Remove the 2 screws securing the control panel and
disengage the panel by lowering and pulling it
forward.
7.
Remove the 2 screws securing the top panel to the
side.
8.
Draw the top panel forward and lift it off the boiler.
9.
Remove the 2 screws securing the LH side panel to
the flue collector and baseplate.
10.
Pull the panel forward, lifting it clear of the locating
peg, and remove.
11.
Repeat steps 9 and 10 to remove the RH panel.
12.
The boiler is held to the packaging base by 4 M6 hex
head screws. Remove the front screws, slacken the
rear screws and remove the boiler from the
packaging base.
INST
ALLA
TION
200944-1.p65
3/8/2004, 3:41 PM
13