INSTALLATION
14
Mexico Super CF495 - CF4140
-
Installation & Servicing
Boiler size Dim. A
Dim. B
Dim. C
CF495
482(19")
256(10")
28(1
1/8
")
CF4120
553(21
3/4
")
256(10")
47(1
7/8
")
CF4140
704(27
3/4
")
286(11
1/4
") 57(2
1/4
")
Connections - as viewed at front
Thermostat Position
Back Section
Front Section
CH
DHW
Flow
Return
Flow
Return
Top
LH
LH
RH
RH
LH
LH
RH
RH
LH
LH
RH
RH
LH
LH
RH
RH
LH
LH
RH
RH
CF4140 ONLY
LH
LH
RH
RH
LH
RH
RH
LH
LH
RH
11 PREPARING THE BOILER
Note
.
Before placing the boiler in the selected position any gas
and water connections at the rear of the boiler should be
prepared, due to the possible lack of access.
1.
Screw the distributor tube (supplied with a 1" BSP x
28mm copper adaptor) into the selected heating
return tapping, using an appropriate jointing
material.
It is
imperative
that the index mark on the distributor
bush is in alignment with the mark on the section
boss, as shown in Frame 7.
DO NOT disturb it when connecting subsequent
pipework.
Fully pumped systems using more than 1 pump,
serving separate zones, must have a common return
connection to the distributor tube.
2.
Select the desired pumped flow tapping.
3.
Screw the supplied boiler thermostat pocket into the
appropriate front section tapping, using an approved
jointing material. Refer to Tables 6 and 7.
4.
Connect pipe fittings to the rear tappings and plug
any unused tappings.
Note
.
If using iron elbows fit a
short straight connector into the boiler tapping first, to
clear the casing when fitted.
5.
Place the boiler in position.
Note
.
The pump may be
fitted on the FLOW or RETURN.
Connections - as viewed at front
Thermostat position
Back Section
Front Section
Flow
Return
Top
LH
LH
LH
LH
RH
LH
RH
RH
RH
RH
LH
RH
CF4140 ONLY
LH
LH
LH
RH
RH
RH
Table 6 - Fully Pumped Systems
Table 7 - Gravity Domestic Hot Water & Pumped Central Heating
12 GAS CONNECTION
1.
A MINIMUM working gas pressure of 20
mbar (8 in.w.g.) MUST be available at the
boiler inlet, with the boiler operating.
2.
Extend a gas supply pipe to the boiler
(for size refer to Table 1, page 2) and
connect to the gas cock situated at the
front LH side of the boiler.
3.
Test the gas installation for soundness
and purge in accordance with BS.6891:
1988. Refer to Frame 25.
INST
ALLA
TION
200944-1.p65
3/8/2004, 3:41 PM
14