21
Mexico Slimline RS 3/40 & 3/50 -
Installation
25 GENERAL CHECKS
Make the following checks for correct operation:
1.
Turn the boiler thermostat OFF and ON to check that the
main burner is extinguished and relit in response.
2.
Check that the programmer, if fitted, and all other system
controls function correctly.
Operate each control separately and check that the main
burner or circulating pump (as the case may be) responds.
3. Flame failure device
The flame failure device must cut off the gas to the burner
within 60 seconds.
Check the operation of the flame failure
device in the gas control valve as follows:
a.
With the burner alight, turn the gas control knob
clockwise until resistance is felt and then release it. The
burner and pilot flame should shut down immediately.
Note.
A latch in the gas control valve provides a safety
delay period of approximately 30 seconds before the
pilot can be relit.
b.
The correct operation of external system controls
should be proved. Turn each, in turn, to OFF and ON
and check that the main burner or circulating pump
responds.
Thermostat
Flow Temperature
Knob Setting
0
C
0
F
1
54
130
2
60
140
3
66
150
4
71
160
5
77
170
6
82
180
1.
Hand the User's Instructions to the householder and
explain his or her responsibilities under the Gas Safety
(Installation and Use) Regulations 1994, amendments
1996 or rules in force.
2.
Draw attention to the lighting instruction label affixed to the
inside of the controls door.
3.
Explain and demonstrate the lighting and shutting down
procedures.
4.
The operation of the boiler and the use and adjustment of
ALL system controls should be fully explained to the
householder, to ensure the greatest possible fuel
economy consistent with household requirements of both
heating and hot water consumption.
Advise the User of the precautions necessary to prevent
damage to the system and to the building, in the event of
the system remaining inoperative during frosty conditions.
Notes.
a.
If an optional programmer kit is fitted refer to the
separate Programmer Kit Installation Instructions and
User's Instructions.
b.
The temperatures quoted below are approximate and
vary between installations.
26 HANDING OVER
After completing the installation and commissioning of the system the installer
should hand over to the householder by the following actions:
5.
Explain the function and the use of the boiler thermostat
and external controls.
6.
Explain and demonstrate the function of time and
temperature controls, radiator valves etc., for the
economic use of the system.
7.
If an optional Programmer Kit is fitted then draw attention
to the Programmer Kit User's Instructions and hand them
to the householder.
8. After installation, commissioning and customer hand-
over instructions please complete the
appliance log book and leave this with the customer.
9.
Stress the importance of regular servicing by a CORGI
registered installer and that a comprehensive service
should be carried out AT LEAST ONCE A YEAR.
INST
ALLA
TION
4. Water Circulation System
a.
With the system HOT, examine all water connections
for soundness.
b.
With the system still hot, turn off the gas, water and
electricity supplies to the boiler and drain down, in
order to complete the flushing process.
c.
Refill and vent the system, clear all air locks and again
check for water soundness.
d.
Balance the system.
5.
Finally, set the controls to the user's requirements and
refit the lower panel and close the controls door.
INSTALLATION