12
Mexico Slimline RS 3/40 & 3/50 -
Installation
INSTALLATION
7
PREPARING THE WALL
2.
Place the boiler in the selected position.
Note.
If an extension duct D is to be fitted, this must be done
BEFORE the boiler is placed in position. Refer to Frame 9.
3.
Make good the brickwork around the air duct inside.
INST
ALLA
TION
1
. Cut the appropriate hole in the wall for insertion of the
terminal assembly.
Notes.
a.
Make good the hole on the INSIDE of the building to
the given dimensions BEFORE fitting the boiler, to
facilitate sealing between the terminal and the wall
when the boiler is in position.
b.
The terminal MUST NOT come into contact with a
combustible material such as that used in non-standard
construction of timber frame and plasterboard etc.