18
icos
-
Installation & Servicing
INSTALLATION
FLUE OUTLET
17 PREPARING THE WALL
IMPORTANT.
Ensure that, during the
cutting operation, masonry falling outside
of the building does not cause damage or
personal injury.
1.
Cut the flue hole (preferably with a 5"
core boring tool), ensuring that the
hole is square to the wall.
Both wall faces immediately around
the cut hole should be flat.
2.
Drill 3 holes with a 7mm (
1/4
")
masonry drill and insert the plastic
plugs provided, for the wall mounting
plate.
Note.
If using Stand Off kit option, refer to
instructions in kit.
19 CUTTING THE FLUE - SIDE
Wall thicknesses of 114mm to 535mm
18 CUTTING THE FLUE - REAR
Wall thicknesses of 114mm to 638mm
Note.
If using the extension ducts go to Frame 20.
1.
Measure and note side flue length L. Refer to Frame 14.
2.
Add 155mm (6
1
/
8
") to dimension L and, measuring from
the ring, cut the outer tube only.
3.
To ensure the tube is cut square, mark the flue all the
way around.
4.
Cut the inner tube to a length 20mm (
3/4
") longer to aid
engagement.
Notes.
a.
If using the extension ducts go to Frame 20.
b.
If the stand-off frame is used it is essential to add
33mm to dimension X.
1.
Measure and note wall thickness X. Refer to Frame 14.
2.
Add 67mm (2
5
/
8
") to dimension X and, measuring from
the ring, cut the outer tube only.
3.
To ensure the tube is cut square, mark the flue all the
way around.
4.
Cut the inner tube to a length 20mm (
3/4
") longer to aid
engagement.
ecl8166
Note.
Check all of the hole
positions before drilling
Rear flue only
5" diameter hole
Section
through wall
Side flue only
5" diameter hole
cla7841
cla7841
202414-6.pmd
19/02/2008, 13:07
18