20
Classic FF -
Propane Installation & Servicing
INSTALLATION
REAR & SIDE FLUE OUTLET
33 FLUE EXTENSION DUCTS - For flue lengths greater than 600mm
PACK D Flue extension duct kit contents
31 CONNECTING THE FLUE TO THE BOILER
32 TERMINAL WALL PLATE
This plate allows neat concealment and full compression of
the rubber seal. Its use is not essential if the flue hole and
flue ducts have been accurately cut and the outside wall
face is flat.
1. Position the terminal wall plate over the terminal.
2. Drill 4 fixing holes with a 7mm (
9/32
") masonry drill.
3. Insert the 4 plastic plugs provided.
4. Secure the plate with 4 of the No.10 x 2" screws
provided.
Note.
If the terminal is less than 2m (6' 6") above ground
level, an approved terminal guard should be fitted. Refer to
the Contents List on Page 3.
1. Pull the flue through the side outlet plate and locate
the 3 studs in the hole in the side of the boiler.
2. Secure the flue to the boiler using the three M5 nuts
provided.
3. Insert the flue extension tube into the flue.
4. Fit the 90° flue elbow, supplied with the boiler, onto
the fan in the direction required, after first removing
the underside screw, which is not required. Secure in
position with the screw attached to the fan.
5. Pull the flue extension tube and engage onto the fan
elbow and secure with the screw attached to the
elbow.
Note.
The sealing ring studs will locate in the back panel
one way only. This will ensure that the terminal grille is
correctly aligned.
Summary of Contents for FF 350
Page 1: ......
Page 39: ...Classic FF Propane Installation Servicing 39 NOTES...