13
Concord CXSD/H -
Installation & Servicing
INSTALLATION
13 CASING ASSEMBLY - continued
4.
Fit 3 clips to the top of each side panel.
5.
Fit the spire clips to the side casing panels.
6.
Hook on the control box to side panels.
Screw in self tapping screws at the bottom of
the control box to fix it to the side panels.
7.
Route the thermostat capillary through the cable clips as
shown.
Ensure the phial is correctly seated in the correct pocket
opposite side to the flow connection. Refer to Frame 9.
Secure with the split pin provided.
8.
Route the temperature sensing probe through the
cable clips provided and into the thermostat pocket
adjacent to the flow connection.
Fit the plastic Heyco bush over the sensor lead at the
line shown and insert it into the thermostat pocket.
Ensure that the Heyco bush is correctly located.
9.
Fit earth leads as shown
INST
ALLA
TION
Summary of Contents for Concord CXSD 40/H
Page 1: ......