12
Concord CXSD/H -
Installation & Servicing
INSTALLATION
11 GAS CONNECTION
10 FLUE CONNECTION
1.
Complete the flue connection.
2.
The boiler is designed to accept flues to BS. 835 and
should be sealed with an approved boiler putty.
1.
Connect the gas
supply to the gas
inlet pipe at the
rear LH side of
the boiler.
2.
Table 2 gives
details of the
inlet connection
size and the
minimum
working
pressures.
12 CASING ASSEMBLY
1.
Unpack the control box from its carton and release the
temperature sensing probe strapped to the back of the
box.
The boiler casing should now be fitted.
A casing hardware pack contains all the screws required
for assembly.
2.
Slide bottom of the side panel on to the studs on the
base tray.
3.
Screw the side panel to the support angle.
Repeat for other side.
INST
ALLA
TION
Summary of Contents for Concord CXSD 40/H
Page 1: ......