© 2007 ICS, Blount Inc.
F/N 71537 Oct 07
TITLE
613GC SERVICE MANUAL
50
15. IGNITION COIL
15.5 Install Ignition coil.
A Place ignition coil shim (0.012”)
on magnet counterweight side of
flywheel.
B Set ignition coil in place.
C Install ignition coil screws, wave
washers, and plain washers with blue
Loctite
®
.
Holding shim, rotate flywheel magnet
around to coil.
E T
orque ignition coil screws to
26 in-lbs. (3 Nm).
F Remove shim, rotate flywheel to
check clearance.
15.6 Install flywheel shroud
15.7 Route yellow ignition stop switch wire
through crankcase into carburetor
chamber.
15.8 Complete ignition wire routing.
Summary of Contents for 613GC
Page 1: ...F N 71537 Oct 07 2007 ICS Blount Inc 613GC SERVICE MANUAL...
Page 2: ......
Page 14: ...2007 ICS Blount Inc F N 71537 Oct 07 TITLE 613GC SERVICE MANUAL 12 4 SPARE PARTS DIAGRAM...
Page 81: ......
Page 82: ......
Page 83: ......