© 2007 ICS, Blount Inc.
F/N 71537 Oct 07
TITLE
613GC SERVICE MANUAL
46
13. CYLINDER & PISTON
13.27 Install carburetor base.
A Slip pulse tube into carburetor base.
B Slip rear manifold into carburetor
base.
C Make sure rear manifold lip is flat.
13.28 Install carburetor base screws.
A Use blue Loctite
®
on 3 screws without
ground wire.
B Make sure to include stop switch
wire.
C T
orque to 35 in-lbs. (4 Nm).
Summary of Contents for 613GC
Page 1: ...F N 71537 Oct 07 2007 ICS Blount Inc 613GC SERVICE MANUAL...
Page 2: ......
Page 14: ...2007 ICS Blount Inc F N 71537 Oct 07 TITLE 613GC SERVICE MANUAL 12 4 SPARE PARTS DIAGRAM...
Page 81: ......
Page 82: ......
Page 83: ......