background image

28

TABLE # 4.2

Technical specifications

TABLE #5.2

Air delevery - CFM with air filter

Model : OUF / NOUF

RATING AND PERFORMANCE

Firing rate

.50

.63

.75

.72

.85

.97

1.14

Pump pressure (PSIG)

100

156

156

145

130

130

130

Input (BTU/h)

70 000

88 200

105 000

100 800

119 000

135 800

159 600

Heating capacity, chimney installation (BTU/h) 

58 900

73 500

86 100

98 000

110 000

127 000

Heating capacity, side-w all installation (BTU/h)

59 800

74 600

87 800

83 900

97 000

110 000

127 000

Minimum - maximum temperature rise

Stack draft, (Chimney), (Side-w all)

Overfire pressure (chimney), (Side-w all)

BECKETT BURNER, CHIMNEY INSTALLATION

Low   f iring rate baffle

Yes

Yes

Yes

Yes

Yes

Yes

Static disc, model

2 3/4 #3383 2 3/4 #3383 2 3/4 #3383

2 3/4 #3383 2 3/4 #3383 2 3/4 #3383

Nozzle (Delavan)

0.50 - 70A

0.50 - 70A

0.60 - 70B

0.75 - 70B

0.85 - 70B

1.00 - 70B

Combustion air adjustment (shutter / band)

4.5 / 0

8 / 0

7.5 / 0

5 / 0

6,5 / 0

10 / 0

RIELLO BURNER, CHIMNEY INSTALLATION

Nozzle (Delavan)

0.50 - 60A

0.60 - 60A

0.75 - 70B

0.85 - 70B

1.00 - 70B

Combustion air adjustment (turbulator / damper)

0 / 3

0 / 4

0 / 2.5

0 / 2.8

0 / 3.9

BECKETT BURNER, SIDE-WALL INSTALLATION

Nozzle  (Delavan)

0.50 - 60W 0.50 - 60W 0.60 - 60W

0,75 - 70B

0,85 - 70B

1,00 - 70B

Combustion air adjustment (screw   / dial) or (dial only)

3 / 1.5

3 / 3

3 / 4.5

2,75

4,25

6,0

RIELLO BURNER, SIDE-WALL INSTALLATION

Nozzle (Delavan)

0.50 - 60W

0.60 - 60W 0,75 - 70B

0,85 - 70B

1,00 - 70B

Combustion air adjustment (turbulator / damper)

0 / 6

0 / 7.5

0 / 3,75

0 / 4

0 / 4,875

ELECTRICAL SYSTEM

Volts - Hertz - Phase

Operating voltage range

104 - 132

Rated voltage Amp

Minimum ampacity for w iring sizing

Max. fuse size (Amps)

Control transformer

Ext. control pow er available, cooling and accessories

BLOWER DATA

Blow er speed at 0.5" W.C. static pressure

LOW

LOW

MED-HI

MED-HI

MED-LO

MED-HI

HIGH

Blow er speed at 0.25" W.C. static pressure

LOW

LOW

MED-LO

MED-LO

MED-LO

MED-LO

MED-HI

Maximum cooling, speed

LOW

MED-LO

MED-HI

HIGH

MED-LO

MED-HI

HIGH

Maximum cooling, tons @ 5" W.C.

2

2.5

2.5

3

3.5

4

5

Motor (HP) / number of speeds

Blow er w heel size (in.)

Filter quantity and size

50 - 80 Degr. F

115-60-1

40-F3 (tube insersion 5 3/16")

AFG-F3 (tube insersion 6 5/8")

40-F5 (tube insersion 6 5/8")

AFII-85 (tube insersion 4 15/16")

(0,00 to +0,035) (+0,10 to +0,25)

(0,00 to +0,04) (+0,10 to +0,25)

AFII-150 (tube insersion 6 5/8")

52 - 75 Degr. F

16.9

19.5

(-0,035 to -0,06) (+0,04 to +0,16)

(-0,035 to -0,6) (+0,04 to +0,18)

115-60-1

40-BF3 (tube insersion 5 3/16")

AFG-F0 (tube insersion 5 1/8")

(1) 20 X 20

20

40 Va

40 - BF5 (tube insersion 6 5/8")

40 Va

30 Va

(1) 24 X 24

20

0.85 HP / 4 speeds

12 X 10

30 Va

1/2 HP / 4 speeds

10 X 10 

104 - 132

15.4

17.7

OUF105A12B / NOUF105A12B

OUF160B18B / NOUF160B18B

SPEED

0.25

0.5

0.25

0.5

LOW

960

920

1080

990

MED-LO

1100

1000

1350

1310

MED-HI

1300

1150

1605

1510

OUF105A12B / NOUF105A12B

OUF160B18B / NOUF160B18B

EXTERNAL STATIC PRESSURE WITH AIR FILTER

EXTERNAL STATIC PRESSURE WITH AIR FILTER

Summary of Contents for OLR Series

Page 1: ...ontrols Call a qualified service technician Save these instructions for future reference Printed in Canada OUF160B18B OLF105A12B DNS 0562 Rev A OUF OLF 2000 11 23 X40030 Rev i 445 01 4030 05 TABLE OF...

Page 2: ...duct or property damage 1 3 Signal Words in Manuals The signal word WARNING is used throughout this manual in the following manner WARNING WARNING The signal word CAUTION is used throughout this manua...

Page 3: ...rces of carbon monoxide in a building or dwelling The sources could be gas fired clothes dryers gas cooking stoves water heaters furnaces gas fired fireplaces wood fireplaces and several other items C...

Page 4: ...ower motors controls and flue connections The furnace may be installed on a combustible floor Do not install furnace directly on carpeting tile or other combustible material The furnace must be instal...

Page 5: ...point of the flue gasses is raised To offset the increased tendency for vent condensation the chimney must be lined Additionally the liner must be insulated according to the insulating procedure reco...

Page 6: ...FII and Riello 40 BF oil burners Outdoor combustion air must be directly connected to the burner of the DV 2000 venting system will not function The notable characteristics of the DV 2000 system are a...

Page 7: ...ldings and that serves both buildings b less than 7 feet above any paved driveway c within 6 feet of a window or door or mechanical air supply inlet to any building including soffit openings d above a...

Page 8: ...ER SLEEVE BACK 5 THREAD SPIN SLEEVE BACK 10 CUT STAINLESS STEEL CORE BACK BY 3 9 FIGURE 1 3 FIGURE 1 4 FIGURE 1 1 FIGURE 1 2 DRIVE THREE STAINLESS STEEL SCREWS STARTING NEAR TOP INSERT STAINLESS STEEL...

Page 9: ...r the line where the corrugated stainless steel core makes the transition to the smooth outer surface of the breech pipe In other words the seal strip must be centered over the joint After wrapping th...

Page 10: ...ER BAND CLAMP AT BREECH TWIST SPIN SLEEVE TIGHTLY INTO BREECH COLLAR SEALANT OUTFLOW 11 FIGURE 1 9 FIGURE 1 10 FIGURE 1 7 FIGURE 1 8 SEALANT FLOWING OUT FROM UNDER BOND CLAMP AT TERMINAL SEALANT OUT F...

Page 11: ...ding on the angle of access the pressure control bracket may need to be removed to access the top right wall plate screw hole For concrete and block Tapcon screws or equivalent are recommended Install...

Page 12: ...SLEEVE TIGHTLY INTO RECESS INSTALL STABILIZER SHROUD CAULK TO SEAL STABILIZER SHROUD TO THE WALL FIGURE 1 13 FIGURE 1 14 FIGURE 1 12 VENT TERMINAL PRESSURE SWITCH REFER TO WIRING DIAGRAM FOR ELECTRIC...

Page 13: ...ust be evaluated carefully as it may be necessary to provide outside air for combustion a Commercial building b Building with indoor pools c Furnaces installed near chemical storage areas Exposure to...

Page 14: ...ards PVC ASTM D 1785 SDR26 SDR21 ASTM D 2241 Septic Sewer Pipe ASTM D 2729 PVC DWV ASTM D 2665 PVC Primer and Solvent Cement ASTM D 2564 ABS Pipe and Fittings ASTM D 2235 Procedure for Cementing Joint...

Page 15: ...shut off valve and an oil filter shall follow sequence from tank to burner Be sure that the oil line is clean before connecting to the burner The oil line should be protected to eliminate any possible...

Page 16: ...r to keep the lifetime heat exchanger warranty intact NOTE You may notice a slight odor the first time your furnace is operated This will soon disappear It is only the oil used on the parts during man...

Page 17: ...air flow control Cold air from the evaporator coil going through the furnace could cause condensation and shorten furnace life CAUTION Dampers purchased locally MUST be automatic WARNING WARNING Poiso...

Page 18: ...ark for this time period 11 During the post purge cycle the fan limit control cools down to the factory set point of 90 degrees Fahrenheit and the circulating air blower turns off 2 2 Sequence of oper...

Page 19: ...s off 2 4 Sequence of operation internal furnace controls All models No call for heating or cooling Power is available to the Electronic Air Cleaner EAC at all times Power at L1 enters the common term...

Page 20: ...calls the furnace must be thoroughly tested Open the oil bleed port screw and start the burner Allow the oil to flush into a portable container for at least 10 seconds Slowly close the bleed screw the...

Page 21: ...upply air temperature rise test 1 Operate the burner for at least 10 minutes 2 Measure the temperature of the air in the return air plenum 3 Measure the temperature of the air in the largest trunk com...

Page 22: ...lame can t possibly shut down before a 1 smoke occurs during a blockage condition PART 3 MAINTENANCE 1 GENERAL Preventive Maintenance Preventive maintenance is the best way to avoid unnecessary expens...

Page 23: ...he pot if the cracks have propagated more than 2 3 the way through the wall thickness The average wall thickness of the firepot is 3 4 Flooding of the fire pot Flooding can occur when the oil primary...

Page 24: ...he instructions for starting the burner for the first time to cure the firepot and perform combustion checks 1 3 Drawer assembly Remove the drawer assembly Clean all foreign matter from the retention...

Page 25: ...vice telephones day Night Dealer s name and address RESULT OF START UP TEST Nozzle Pressure lbpsi Burner adjustments Primary air Fine air Draw Assembly CO 2 Smoke scale Bacharach Gross stack temperatu...

Page 26: ...4 25 6 75 RIELLO BURNER SIDE WALL INSTALLATION Nozzle Delavan 0 50 60W 0 60 60W 0 75 70B 0 85 70B 1 00 70B Combustion air adjustment turbulator damper 0 6 0 7 5 1 3 1 4 2 4 5 ELECTRICAL SYSTEM Volts H...

Page 27: ...60W 0 60 60W 0 75 70B 0 85 70B 1 00 70B Combustion air adjustment turbulator damper 0 6 0 7 5 0 3 75 0 4 0 4 875 ELECTRICAL SYSTEM Volts Hertz Phase Operating voltage range 104 132 Rated voltage Amp M...

Page 28: ...0 60 60W Combustion air adjustment screw dial 3 1 5 3 3 3 4 5 RIELLO BURNER SIDE WALL INSTALLATION Nozzle Delavan 0 50 60W 0 60 60W Combustion air adjustment turbulator damper 0 6 0 7 5 ELECTRICAL SYS...

Page 29: ...DNS 0571 Rev B DNS 0573 Rev B 30 FIGURE 5 1 Model OLR105A12B FIGURE 5 2 Model OLR160B20B...

Page 30: ...31 FIGURE 5 3 Model OUF105A12B FIGURE 5 4 Model OUF160B18 DNS 0568 Rev C DNS 0572 Rev C...

Page 31: ...FIGURE 5 5 Model OLF105A12B DNS 0570 Rev B FIGURE 5 6 Model NOUF105A12B 32 DNS 0674 Rev C...

Page 32: ...33 FIGURE 5 7 Model NOUF160B18B FIGURE 5 8 Model NOLF105A12B DNS 0676 Rev C DNS 0675 Rev D...

Page 33: ...34 FIGURE 6 Wiring diagram OLR105A12B OLR160B20B OUF105A12B NOUF105A12B OUF160B18B NOUF160B18B OLF105A12B NOLF105A12B DNS 0447 Rev I...

Page 34: ...B30459 27B 3 breech plate B30515 28 Gasket breech plate B30415 02 29 Electrical box cover without cosmetic B40085 30 Electrical box B30514 31 Rocker switch SPST L07F003 ITEM DESCRIPTION MANUFAC 32 Fa...

Page 35: ...panel ass y B30680 01 30 Right side panel insulation B30686 01 31 Right bottom filter support B30668 01 32 Right top filter support B30667 ITEM DESCRIPTION MANUFAC 33 Front panel ass y B30782 01 34 Fr...

Page 36: ...breech plate B30415 02 23 Hexagonal flange nut 3 8 16NC brass F07O001 24 Hexagonal nut 3 8 16NC brass F07F024 25 Washer 3 8 AA zinc F06F005 ITEM DESCRIPTION MANUFAC 26 Terminal strip 6 positions L05F...

Page 37: ...el ass y B30781 01 27 Front panel insulation B30779 28 Blower door ass y B30651 29 Door handle Z99F050 30 Washer 3 8 AA zinc F06F005 ITEM DESCRIPTION MANUFAC 31 Hexagonal nut 3 8 16NC brass F07F024 32...

Page 38: ...r peep hole B30752 26 Hexagonal flange nut 3 8 16NC brass F07O001 27A 5 breech plate B30459 27B 3 breech plate B30515 28 Gasket breech plate B30415 02 29 Electrical box cover without cosmetic B40085 I...

Page 39: ...024 25 Washer 3 8 AA zinc F06F005 26 Terminal strip 6 positions L05F011 27 Electrical box cover without cosmetic B40085 28 Relay SPDT 24VAC L01H009 ITEM DESCRIPTION MANUFAC 29 Transformer 120 24 VAC 4...

Page 40: ...handle Z99F050 30 Washer 3 8 AA zinc F06F005 31 Hexagonal nut 3 8 16NC brass F07F024 32A 5 breech plate B30646 32B 4 breech plate B30647 ITEM DESCRIPTION MANUFAC 33 Hexagonal flange nut 3 8 16NC bras...

Page 41: ...27B 3 breech plate B30515 28 Gasket breech plate B30415 02 29 Electrical box cover without cosmetic B40085 30 Electrical box B30514 31 Rocker switch SPST L07F003 32 Fan limit control R02I005 ITEM DESC...

Reviews: