
GW-7552-B / GW-7552-M PROFIBUS/MODBUS GATEWAY User Manual
(Version 1.60, May/2017)
PAGE: 42
4.7 Establish connection with GW-7552-B / GW-7552-M
Before establishing a connection between the DP-Master and the GW-7552-B /
GW-7552-M, user should execute the following steps first.
Figure 36 Establish connection with GW-7552-B / GW-7552-M
First, users must load the electronic device description file (GSD file) of the GW-
7552-B / GW-7552-M into the DP-Master, and then set the parameters. Finally
change your DP-master from Offline state to Operate state. While DP-Master
changes to operate mode, GW-7552-B / GW-7552-M will initial the modules.
Then GW-7552-B / GW-7552-M allocates the memory space and waits for
Set_Prm telegram. The next step is waiting for Check_Cfg telegram in order. If
there is no error occurs, GW-7552-B / GW-7552-M proceeds into data exchange
state. Users can observe the status indicator LED to know the state of GW-7552-B
/ GW-7552-M. At the meantime, if there is any error occurs, GW-7552-B / GW-