10
8. Identify the Left Upright Cover (87). Slide the
Left Upright Cover onto the Left Upright (82).
Identify the Left Handrail (78). Start two 5/16" x
3/4" Patch Bolts (5) and two 5/16" Star Washers
(9) into the Left Handrail and the Left Upright
(82). Then start a 5/16" x 1 1/2" Patch Bolt (4)
into the Left Handrail and the Left Upright.
Do
not tighten the Patch Bolts yet.
78
4
5
9
82
87
8
7. Attach the Base Cover (84) to the Base (94)
with four #8 x 1/2" Screws (1).
Be careful not
to overtighten the Screws.
With the help of a second person, tip the tread-
mill so that the Base (94) is flat on the floor.
84
94
1
1
1
1
7