BIA-DPC1 rev 4
Page 20
3.0
Installation
–
BOOSTING
3.1
Electrical connection to the power supply and pump
DANGER. Electric shock risk.
Before carrying out any installation or maintenance operation, the control panel should be disconnected from
the power supply and one should wait at least 2 minutes before opening the control panel.
Never connect AC power to output L and N terminals.
Ensure the motor, controller and power specifications match.
The electrical and hydraulic connections must be carried out by competent, skilled, qualified personnel.
Main Circuit Breaker